Innovative computational model for optimal deep coal mining under large-scale crustal stress conditions

Understanding and controlling the ground stress in deep coalfield mining is crucial for ensuring mine safety and efficiency. This study aims to address two unresolved scientific issues in ground stress research: the selection of optimal excavation plans and the large-scale rapid acquisition of ground stress data. A novel computational model is proposed for key rock layer control under different crustal stress conditions. The model considers the complexity and uncertainty of ground stress distribution by simplifying the key rock strata into a fixed-fixed beam model and calculating their safety through mechanical methods. Introducing an innovative approach for acquiring large-scale stress fields using GPS data. By inverting large-scale strain fields in the coalfield area, combined with World Stress Map (WSM) and measured data, accurate stress fields are obtained. The proposed optimal excavation plan can be applied to various coalfield locations worldwide, providing a scientific basis for safe and efficient mining operations. Additionally, the innovative use of GPS data in obtaining large-scale stress fields offers a valuable tool for assessing ground stress variation.

Authors

Institutions

Publication Details

Journal
Scientific Reports
Published
2024-11-11
DOI
https://doi.org/10.1038/s41598-024-77830-8
Primary Topic
Geotechnical and Geomechanical Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Innovative computational model for optimal deep coal mining under large-scale crustal stress conditions

Dechen Yao, Yingying Xing, Shuanhu Li, Chi Li
Scientific Reports
Geotechnical and Geomechanical Engineering
article

Innovative computational model for optimal deep coal mining under large-scale crustal stress conditions

Dechen Yao, Yingying Xing, Shuanhu Li, Chi Li
article en

Abstract

Understanding and controlling the ground stress in deep coalfield mining is crucial for ensuring mine safety and efficiency. This study aims to address two unresolved scientific issues in ground stress research: the selection of optimal excavation plans and the large-scale rapid acquisition of ground stress data. A novel computational model is proposed for key rock layer control under different crustal stress conditions. The model considers the complexity and uncertainty of ground stress distribution by simplifying the key rock strata into a fixed-fixed beam model and calculating their safety through mechanical methods. Introducing an innovative approach for acquiring large-scale stress fields using GPS data. By inverting large-scale strain fields in the coalfield area, combined with World Stress Map (WSM) and measured data, accurate stress fields are obtained. The proposed optimal excavation plan can be applied to various coalfield locations worldwide, providing a scientific basis for safe and efficient mining operations. Additionally, the innovative use of GPS data in obtaining large-scale stress fields offers a valuable tool for assessing ground stress variation.

Scientific ReportsVol. 14(1)
Inner Mongolia University (CN), Inner Mongolia University of Technology (CN)
Industry, innovation and infrastructure
Openalex Percentile: Top 78%
Geotechnical and Geomechanical Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.