Evaluation of Performance Improvement Rate of Plastic Production System Using ARENA: A Case Study of Phoenix Plastic Services

Production improvement has become essential to all industrial activity because of the fierce competition among today's production systems and organizations and the unquenchable customer demand. The shorter product life cycle has significantly increased the demand for prompt reactions to increase the productivity and efficiency of these industrial systems. This study examined the evaluation of performance improvement rate of plastic production system using ARENA. The report provided by the plastics industry was used in the study to analyze and assess the rate of performance improvement of the plastic manufacturing system. The location of the bottleneck was determined by the research following a thorough analysis of the plastic company's data, which included information on all manufacturing lines and procedures. The research employed Arena to assess and compute the rate of improvement in system performance while accounting for the material transporting process throughout the production line. The conveyor velocity maintains a lock at 75m/min, despite the company's report stating that the transports run at 30m/min. The optimized and unoptimized processes when obtained from a finished recycling process running for 1000 working hours, indicate that the conveyor process had 1045 and 1027 entity input and output, respectively, and the transporter process had 953 and 929 entities input and output respectively. The remaining number left when considering the number that enters the system with the number that leaves the system went to waste, resulting from the sorting and demagnetization process. The introduction of the conveyor brings 10.549% in the production rate and 50% decrease on expenses spent in labor. Through the conveyor system's speed control factor, which is an automated procedure, the system's percentage increment may be further raised. By raising the conveyor system's speed, more items will be produced. Conveyor system installation free up more space for additional production-related equipment, increasing products formed and the company's profit. The cost of purchasing and installing the conveyor will be covered by the excess profit.

Authors

Institutions

Publication Details

Journal
Journal of basic and applied research international
Published
2024-11-08
DOI
https://doi.org/10.56557/jobari/2024/v30i68938
Primary Topic
Digital Transformation in Industry
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation of Performance Improvement Rate of Plastic Production System Using ARENA: A Case Study of Phoenix Plastic Services

Bethel Mba, Uchenna Alozie, Franklin Onwuka, Okafor Monday Onyekachi
Journal of basic and applied research international
Digital Transformation in Industry
article

Evaluation of Performance Improvement Rate of Plastic Production System Using ARENA: A Case Study of Phoenix Plastic Services

Bethel Mba, Uchenna Alozie, Franklin Onwuka, Okafor Monday Onyekachi
article en

Abstract

Production improvement has become essential to all industrial activity because of the fierce competition among today's production systems and organizations and the unquenchable customer demand. The shorter product life cycle has significantly increased the demand for prompt reactions to increase the productivity and efficiency of these industrial systems. This study examined the evaluation of performance improvement rate of plastic production system using ARENA. The report provided by the plastics industry was used in the study to analyze and assess the rate of performance improvement of the plastic manufacturing system. The location of the bottleneck was determined by the research following a thorough analysis of the plastic company's data, which included information on all manufacturing lines and procedures. The research employed Arena to assess and compute the rate of improvement in system performance while accounting for the material transporting process throughout the production line. The conveyor velocity maintains a lock at 75m/min, despite the company's report stating that the transports run at 30m/min. The optimized and unoptimized processes when obtained from a finished recycling process running for 1000 working hours, indicate that the conveyor process had 1045 and 1027 entity input and output, respectively, and the transporter process had 953 and 929 entities input and output respectively. The remaining number left when considering the number that enters the system with the number that leaves the system went to waste, resulting from the sorting and demagnetization process. The introduction of the conveyor brings 10.549% in the production rate and 50% decrease on expenses spent in labor. Through the conveyor system's speed control factor, which is an automated procedure, the system's percentage increment may be further raised. By raising the conveyor system's speed, more items will be produced. Conveyor system installation free up more space for additional production-related equipment, increasing products formed and the company's profit. The cost of purchasing and installing the conveyor will be covered by the excess profit.

Journal of basic and applied research internationalVol. 30(6)
University of Nigeria (NG), University of Chester (GB), Federal Polytechnic Nekede (NG), Michael Okpara University of Agriculture (NG)
Responsible consumption and production
Openalex Percentile: Top 71%
Digital Transformation in Industry
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.