The effects of time-to-build and regulation on investment timing and size
This study investigates the effects of the delay of revenue generation on a firm’s investment timing and size decisions. Time-to-build and regulation are considered as internal and external factors that impede the firm’s instant revenue generation, respectively. We show that in the absence of regulation, uncertainty in time-to-build always advances the timing of investment; however, the capacity size is independent of time-to-build. We also show that in the absence of time-to-build, the presence of regulation increases the expected capacity size and the uncertainty of regulation amplifies this effect. When both time-to-build and regulation exist, uncertainty in the delay of revenue generation by the two factors can advance the investment timing and increase the size, improving firm value. • Time-to-build and regulation are considered as factors that delay revenue generation. • Uncertainty in time-to-build always advances investment timing. • Absent regulation, the optimal capacity size is independent of time-to-build. • Absent time-to-build, the presence of regulation increases expected capacity size. • Regulatory uncertainty can make positive impacts on investment timing and its size.
Authors
- Haejun Jeon (ORCID: https://orcid.org/0000-0001-7297-9316)
Institutions
- Tokyo University of Science (JP)
Publication Details
- Journal
- International Review of Financial Analysis
- Published
- 2024-11-01
- DOI
- https://doi.org/10.1016/j.irfa.2024.103741
- Citations
- 3
- Primary Topic
- Capital Investment and Risk Analysis
- Type
- article
- Field-Weighted Citation Impact
- 1.62