Research on reentrant job shop scheduling problems with infinite buffers
Job Shop Scheduling (JSP) and Flow Shop Scheduling (FSP) represent typical production scheduling problems. This paper delves into a JSP variant, Re-entrant Job Shop Scheduling (RJSP) with infinte buffers, introducing reentrance where certain jobs revisit machines at multiple steps. This paper devise a re-entrant job shop scheduling model with infinite buffers, aiming to minimize maximum completion time. Additionally, this paper propose an improve genetic algorithm for RJSP resolution, employing diverse initial solution generation methods and efficient crossover and mutation operators.
Authors
- Xiao‐Feng Wu (ORCID: https://orcid.org/0000-0001-6622-3328)
- Shijiao Li (ORCID: https://orcid.org/0009-0000-2549-6397)
- Hui Tian (ORCID: https://orcid.org/0000-0001-8876-1389)
- Chuang Song (ORCID: https://orcid.org/0000-0001-9181-9529)
- Mingfu Zhu
- Ronghan Wei (ORCID: https://orcid.org/0000-0002-7571-8223)
- Yangjie Cao (ORCID: https://orcid.org/0000-0002-1170-4340)
- Chunxue Shi
Institutions
- Zhengzhou University (CN)
Publication Details
- Published
- 2024-11-08
- DOI
- https://doi.org/10.1117/12.3049479
- Primary Topic
- Scheduling and Optimization Algorithms
- Type
- article
- Field-Weighted Citation Impact
- 0.00