Identifying the agile project management implementation barriers for sustainable residential buildings

Incorporating sustainability concepts at all decision-making stages in the construction of residential buildings is essential to maximize benefits without compromising functionality. This study aimed to identify and analyze the obstacles hindering the application of Agile Project Management (APM) in residential construction projects. The research specifically addressed the following questions: What are the key barriers to APM adoption in Nigerian residential construction projects? How do these barriers impact the effectiveness of APM in promoting sustainability? A questionnaire survey was distributed to 120 construction professionals in Nigeria, capturing insights on APM challenges. Exploratory factor analysis was employed to categorize these obstacles into four main areas: social, economic, human factors, and culture and expectations. Subsequently, partial least squares-structural equation modeling was used to construct a model assessing the significance of these barriers. The findings revealed that economic factors, with a statistical significance coefficient of 0.516, are the most significant barriers to APM adoption. Social factors, cultural expectations, and human factors also play notable roles, though to a lesser extent. The outcomes provide valuable guidance for decision-makers in Nigeria’s construction sector, emphasizing the need for strategies that address economic constraints and foster greater adoption of APM practices to achieve cost reduction and enhanced sustainability.

Authors

Institutions

Publication Details

Journal
International Journal of Engineering Business Management
Published
2024-11-06
DOI
https://doi.org/10.1177/18479790241299634
Citations
13
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
3.45

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Identifying the agile project management implementation barriers for sustainable residential buildings

Ahmad M. A. Zamil, Mohammad Alhusban, Ahmed Farouk Kineber, Ziyad Abunada et al.
13 citations
International Journal of Engineering Business Management
BIM and Construction Integration
3.45
article

Identifying the agile project management implementation barriers for sustainable residential buildings

Ahmad M. A. Zamil, Mohammad Alhusban, Ahmed Farouk Kineber, Ziyad Abunada, Nehal Elshaboury, Ayodeji Emmanuel Oke, Mohamed Elseknidy, Samuel Adebobola Ilori
article en
13 citations

Abstract

Incorporating sustainability concepts at all decision-making stages in the construction of residential buildings is essential to maximize benefits without compromising functionality. This study aimed to identify and analyze the obstacles hindering the application of Agile Project Management (APM) in residential construction projects. The research specifically addressed the following questions: What are the key barriers to APM adoption in Nigerian residential construction projects? How do these barriers impact the effectiveness of APM in promoting sustainability? A questionnaire survey was distributed to 120 construction professionals in Nigeria, capturing insights on APM challenges. Exploratory factor analysis was employed to categorize these obstacles into four main areas: social, economic, human factors, and culture and expectations. Subsequently, partial least squares-structural equation modeling was used to construct a model assessing the significance of these barriers. The findings revealed that economic factors, with a statistical significance coefficient of 0.516, are the most significant barriers to APM adoption. Social factors, cultural expectations, and human factors also play notable roles, though to a lesser extent. The outcomes provide valuable guidance for decision-makers in Nigeria’s construction sector, emphasizing the need for strategies that address economic constraints and foster greater adoption of APM practices to achieve cost reduction and enhanced sustainability.

International Journal of Engineering Business ManagementVol. 16
Prince Sattam Bin Abdulaziz University (SA), Federal University of Technology (NG), Housing and Building National Research Center (EG), National Research Centre (EG), University of Business and Technology (SA), Central Queensland University (AU), Teesside University (GB), Middle East University (JO)
Prince Sattam bin Abdulaziz University, Middle East University
Openalex Percentile: Top 7%
BIM and Construction Integration
3.45
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.