Cost Efficiency in Implementation of Pipe Siphons and Concrete Siphons Construction on the Rababaka Interbasin Channel of Dompu Regency Complex

Implementation of a project is often found the result is not suitable for the conditions at the time of implementation. To overcome this, it is necessary to do design adjustments aimed at adjusting the plan of execution with circumstances when the work is implemented. This design adjustment is based on data retrieval directly from existing field conditions by conducting surveys and field engineering. The result of this field engineering will be the basis of calculations for proposed changes in work added/less, volume switching and adding new work items. The minimum Diameter of the Sypon is 0.60 m because it will be used for cleaning and inspection and the maintenance door (gate valve) or main hole. To prevent sedimentation on the base of the Syphon, the water flow velocity in the Sypon should be high. However, high speeds cause increased energy loss. Therefore, the balance between high speed and high loss of energy that is kept must be maintained. The velocity of water flow in the Sypon should be twice higher than the normal speed of the flow in the conduit and should not be less than 1 m/dt, and not more than 1.5 m/dt. Maximum speed should not exceed 3 m/s. Construction of reinforced concrete and pipe Steel Carbon ASTM A 252 Grade 2, two types of construction can be applied on the 1. S RBK siphon, but in terms of ease of implementation as well as the ease of supervision, Steel Carbon ASTM A252 Grade 2 pipe construction is more profitable. Calculation result of work implementation of concrete reinforced Syphon is expensive when compared with the work of Syphon by using Steel Carbon ASTM A 252 Grade 2, with efficiency value of 5.14%.

Authors

Institutions

Publication Details

Journal
RESEARCH REVIEW International Journal of Multidisciplinary
Published
2024-10-21
DOI
https://doi.org/10.31305/rrijm.2024.v09.n10.007
Primary Topic
Geotechnical and construction materials studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Cost Efficiency in Implementation of Pipe Siphons and Concrete Siphons Construction on the Rababaka Interbasin Channel of Dompu Regency Complex

Hafiz Abdul Basit Muhammad, Setiawan Ery, Sulistyono Heri
RESEARCH REVIEW International Journal of Multidisciplinary
Geotechnical and construction materials studies
article

Cost Efficiency in Implementation of Pipe Siphons and Concrete Siphons Construction on the Rababaka Interbasin Channel of Dompu Regency Complex

Hafiz Abdul Basit Muhammad, Setiawan Ery, Sulistyono Heri
article en

Abstract

Implementation of a project is often found the result is not suitable for the conditions at the time of implementation. To overcome this, it is necessary to do design adjustments aimed at adjusting the plan of execution with circumstances when the work is implemented. This design adjustment is based on data retrieval directly from existing field conditions by conducting surveys and field engineering. The result of this field engineering will be the basis of calculations for proposed changes in work added/less, volume switching and adding new work items. The minimum Diameter of the Sypon is 0.60 m because it will be used for cleaning and inspection and the maintenance door (gate valve) or main hole. To prevent sedimentation on the base of the Syphon, the water flow velocity in the Sypon should be high. However, high speeds cause increased energy loss. Therefore, the balance between high speed and high loss of energy that is kept must be maintained. The velocity of water flow in the Sypon should be twice higher than the normal speed of the flow in the conduit and should not be less than 1 m/dt, and not more than 1.5 m/dt. Maximum speed should not exceed 3 m/s. Construction of reinforced concrete and pipe Steel Carbon ASTM A 252 Grade 2, two types of construction can be applied on the 1. S RBK siphon, but in terms of ease of implementation as well as the ease of supervision, Steel Carbon ASTM A252 Grade 2 pipe construction is more profitable. Calculation result of work implementation of concrete reinforced Syphon is expensive when compared with the work of Syphon by using Steel Carbon ASTM A 252 Grade 2, with efficiency value of 5.14%.

RESEARCH REVIEW International Journal of MultidisciplinaryVol. 9(10)
University of Mataram (ID)
Openalex Percentile: Top 77%
Geotechnical and construction materials studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Cost Efficiency in Implementation of Pipe Siphons and Concrete Siphons Construction on the Rababaka Interbasin Channel of Dompu Regency Complex — Hafiz Abdul Basit Muhammad, Setiawan Ery, et al. · RESEARCH REVIEW International Journal of Multidisciplinary (2024) | TGRS Research Map | TGRS