FACT: Fast and Accurate Multi-Corner Predictor for Timing Closure in Commercial EDA Flows

With technology scaling progressing well into deep nanometer region, the number of technology corners surges from dozens to hundreds. Timing closure at Engineering Change Orders (ECO) stage is becoming increasingly challenging and time-consuming. Existing methodologies mainly focus on improving efficiency by predicting the full-corner timing metrics based on known corners. However, the escalating demand of known corners essential for complete timing deductions significantly prolongs the application of these methods. In this work, we propose a framework called FACT, to fast and accurately predict full-corner timing metrics for timing closure optimization circle. Our approach simplifies the process by necessitating timing analysis under only one known corner. Moreover, our framework seamlessly integrates with commercial EDA design flows, making it practical in industrial environments. Experimental results on open-source designs indicate superior stability of our method. Additionally, our approach achieves a significant runtime speed-up over previous ML-based timing ECO flows. CCS CONCEPTS • Hardware → Methodologies for EDA; Static timing analysis.

Authors

Institutions

Publication Details

Published
2024-09-09
DOI
https://doi.org/10.1109/mlcad62225.2024.10740197
Citations
1
Primary Topic
Infrastructure Maintenance and Monitoring
Type
article
Field-Weighted Citation Impact
0.26

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

FACT: Fast and Accurate Multi-Corner Predictor for Timing Closure in Commercial EDA Flows

Ziyue Han, Hao Yan, Leilei Jin, Jiajie Xu et al.
1 citations
Infrastructure Maintenance and Monitoring
0.26
article

FACT: Fast and Accurate Multi-Corner Predictor for Timing Closure in Commercial EDA Flows

Ziyue Han, Hao Yan, Leilei Jin, Jiajie Xu, Longxing Shi, Shiyang Wu
article en
1 citations

Abstract

With technology scaling progressing well into deep nanometer region, the number of technology corners surges from dozens to hundreds. Timing closure at Engineering Change Orders (ECO) stage is becoming increasingly challenging and time-consuming. Existing methodologies mainly focus on improving efficiency by predicting the full-corner timing metrics based on known corners. However, the escalating demand of known corners essential for complete timing deductions significantly prolongs the application of these methods. In this work, we propose a framework called FACT, to fast and accurately predict full-corner timing metrics for timing closure optimization circle. Our approach simplifies the process by necessitating timing analysis under only one known corner. Moreover, our framework seamlessly integrates with commercial EDA design flows, making it practical in industrial environments. Experimental results on open-source designs indicate superior stability of our method. Additionally, our approach achieves a significant runtime speed-up over previous ML-based timing ECO flows. CCS CONCEPTS • Hardware → Methodologies for EDA; Static timing analysis.

Southeast University (CN)
National Natural Science Foundation of China, Natural Science Foundation of Jiangsu Province
Openalex Percentile: Top 43%
Infrastructure Maintenance and Monitoring
0.26
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.