A mechanized assembly for erecting soil-cement barriers to protect agricultural lands from low-active waste during flood

The object of this study is the process of constructing a waterproof underground barrier from local soil using loess loam and medium-sized sand as an example. The values of waterproofing of soil cements on different types of soil and the norms of net labor consumption corresponding to them were obtained. The research solves the task of protecting agricultural lands in the areas of geological burials of low-level radioactive waste. Configuration of a mechanized drilling mixing assembly for installing a waterproof barrier in the field has been proposed. Waterproofness of soil cement on clay and sandy soils was determined experimentally. The corresponding norms of the net consumption of time for manufacturing the barrier in these soils have been determined. Units of the mechanized assembly are repairable, utilize widely available materials, parts, and mechanisms. As a result of studies on the labor intensity of the installation of soil cement, a net labor rate was established, which varies from 35 to 52 min/m3 depending on the type of soil. The corresponding values of waterproofness, which ranged from W6 to W14, were determined, which substantiates the possibility of effective functioning of soil-cement underground barriers. Options for the structural solution for impenetrable barriers have been offered. The values of the obtained net time rates are explained by the high degree of mechanization of the technological process and the use of local materials. A distinctive feature of the results is the emphasis on the data collection on the time consumption of machines and mechanisms, the characteristics of local soils under production conditions, and the use of local materials. The assembly implies using affordable and repairable units that can be serviced right in the field. Given this, the manufacturability of the proposed process was defined, confirmed by time-keeping studies. The realm of practical application of the reported results are sites within flat areas with sandy or loess bases. Barrier solutions are designed exclusively for geological waste storage facilities under the conditions of a high level of groundwater and the presence of a waterproof layer at the base

Authors

Institutions

Publication Details

Journal
Eastern-European Journal of Enterprise Technologies
Published
2024-10-25
DOI
https://doi.org/10.15587/1729-4061.2024.313044
Primary Topic
Forest Biomass Utilization and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A mechanized assembly for erecting soil-cement barriers to protect agricultural lands from low-active waste during flood

Nataliia Popovych, Олександр Петраш, Олег Богатов, M. Moroz et al.
Eastern-European Journal of Enterprise Technologies
Forest Biomass Utilization and Management
article

A mechanized assembly for erecting soil-cement barriers to protect agricultural lands from low-active waste during flood

Nataliia Popovych, Олександр Петраш, Олег Богатов, M. Moroz, Vasiliy Zotsenko, Ruslan Petrash, V. Malysheva, К. Danova, І. І. Рожко, Olha Nikitchenko
article en

Abstract

The object of this study is the process of constructing a waterproof underground barrier from local soil using loess loam and medium-sized sand as an example. The values of waterproofing of soil cements on different types of soil and the norms of net labor consumption corresponding to them were obtained. The research solves the task of protecting agricultural lands in the areas of geological burials of low-level radioactive waste. Configuration of a mechanized drilling mixing assembly for installing a waterproof barrier in the field has been proposed. Waterproofness of soil cement on clay and sandy soils was determined experimentally. The corresponding norms of the net consumption of time for manufacturing the barrier in these soils have been determined. Units of the mechanized assembly are repairable, utilize widely available materials, parts, and mechanisms. As a result of studies on the labor intensity of the installation of soil cement, a net labor rate was established, which varies from 35 to 52 min/m3 depending on the type of soil. The corresponding values of waterproofness, which ranged from W6 to W14, were determined, which substantiates the possibility of effective functioning of soil-cement underground barriers. Options for the structural solution for impenetrable barriers have been offered. The values of the obtained net time rates are explained by the high degree of mechanization of the technological process and the use of local materials. A distinctive feature of the results is the emphasis on the data collection on the time consumption of machines and mechanisms, the characteristics of local soils under production conditions, and the use of local materials. The assembly implies using affordable and repairable units that can be serviced right in the field. Given this, the manufacturability of the proposed process was defined, confirmed by time-keeping studies. The realm of practical application of the reported results are sites within flat areas with sandy or loess bases. Barrier solutions are designed exclusively for geological waste storage facilities under the conditions of a high level of groundwater and the presence of a waterproof layer at the base

Eastern-European Journal of Enterprise TechnologiesVol. 5(10 (131))
Kharkiv National Automobile and Highway University (UA), O.M. Beketov National University of Urban Economy in Kharkiv (UA), Poltava State Agrarian University (UA)
Openalex Percentile: Top 79%
Forest Biomass Utilization and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.