Water Flooding Design for Defa Oil Field

Currently, water-flooding is responsible for a big portion of world oil production. The vertical sweep efficiency and the areal coverage each of these requires careful sampling to get represented reservoir rock and fluid properties measures of reservoir heterogeneity, Economically, a pilot is a desirable tool for studying oil recovery performance on reservoir sample and then scaled up to yield the performance to be expected from field performance. Defa field was produced since 1968 with good oil flow rate reaching 200,000 BOPD but during the life of the field, the production decreased to 50,000 BOPD in 2001. So, this study was conducted to increase oil production by add some energy to the reservoir to increase average reservoir pressure and try to maintain it to initial pressure and to increase displacement and sweep efficiency. The water flooding design was implemented in sector model in the Defa field using five spots pattern. The study was performed by using Excel and Water Drive software to achieve a good water flooding design. When comparing the results obtained from two calculation methods, the minimum error was equal 0.03 percent and the maximum error was around 12 percent. So, the results were acceptable and the process was recommended to the Defa-field. Keywords: Water flooding; Software; Fractional Flow, Break through.

Authors

Publication Details

Journal
International Science and Technology Journal
Published
2024-10-01
DOI
https://doi.org/10.62341/hkls2410
Primary Topic
Hydraulic Fracturing and Reservoir Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Water Flooding Design for Defa Oil Field

Laila Dao Saleh, Haiat K. Alhaj
International Science and Technology Journal
Hydraulic Fracturing and Reservoir Analysis
article

Water Flooding Design for Defa Oil Field

Laila Dao Saleh, Haiat K. Alhaj
article en

Abstract

Currently, water-flooding is responsible for a big portion of world oil production. The vertical sweep efficiency and the areal coverage each of these requires careful sampling to get represented reservoir rock and fluid properties measures of reservoir heterogeneity, Economically, a pilot is a desirable tool for studying oil recovery performance on reservoir sample and then scaled up to yield the performance to be expected from field performance. Defa field was produced since 1968 with good oil flow rate reaching 200,000 BOPD but during the life of the field, the production decreased to 50,000 BOPD in 2001. So, this study was conducted to increase oil production by add some energy to the reservoir to increase average reservoir pressure and try to maintain it to initial pressure and to increase displacement and sweep efficiency. The water flooding design was implemented in sector model in the Defa field using five spots pattern. The study was performed by using Excel and Water Drive software to achieve a good water flooding design. When comparing the results obtained from two calculation methods, the minimum error was equal 0.03 percent and the maximum error was around 12 percent. So, the results were acceptable and the process was recommended to the Defa-field. Keywords: Water flooding; Software; Fractional Flow, Break through.

International Science and Technology JournalVol. 35(1)
Openalex Percentile: Top 80%
Hydraulic Fracturing and Reservoir Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.