PEMELIHARAAN KONSTRUKSI JALAN DENGAN METODE SDI

The Dawan-Pesinggahan Road section is one of the sections that has the status of a district road in Klungkung Regency. The Dawan Pesinggahan Road section is located in Dawan District, Dawan Village and Pesinggahan Village, which has a length of 3,300 km and an average width of 4.5 m. The Dawan – Pesinggahan Road section has existing conditions in 2021, namely 3,300 km in good condition, 0.9 km in moderate condition and there are conditions of light and heavy damage. In 2022, there will be a lot of road damage which will cause the condition of the road to decline and it is very necessary to assess the condition of the road so that we can find out what measures will be taken to restore road stability on the Dawan-Pesinggahan Road Section. Assessment of road conditions using the SDI method in Klungkung Regency was carried out on the Jl. Dawan – Stopover. The selection of this section as a sample was due to time constraints and the district road section used as a travel center in Klungkung Regency which needs to receive more attention through road management. Apart from that, the section used is a road section that visually has road damage. This research was carried out because there are still damaged roads that need to be treated quickly. This research aims to analyze road conditions, analyze the type of treatment and obtain costs for handling the road section. The data used in the research are primary data and secondary data. Primary data was obtained through a survey of road conditions by measuring road damage, while secondary data was obtained from the community development sector of the Klungkung Regency PUPRPKP Service, namely Klungkung Regency road decrees, Klungkung Regency road maps and basic Klungkung Regency road data. The research stages are, identifying road damage by taking measurements, data recapitulation by processing surveys, data analysis using the SDI method and estimating costs to repair the road. Assessment results for the Jl. Dawan – Pesinggahan Crocodile cracks at 13.54%, random cracks 18.71%, transverse cracks 17.06%, patches 14.66%, holes 12.03% and subsidence 13.24% and the estimated cost required to maintain this road section is IDR. 3,864,775,688.95

Authors

Institutions

Publication Details

Journal
Widya Teknik
Published
2024-10-31
DOI
https://doi.org/10.32795/widyateknik.v20i1.6778
Primary Topic
Urban Transport Systems Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PEMELIHARAAN KONSTRUKSI JALAN DENGAN METODE SDI

Made Novia Indriani, I Putu Laintarawan, Made Mahesa Adi Pratama
Widya Teknik
Urban Transport Systems Analysis
article

PEMELIHARAAN KONSTRUKSI JALAN DENGAN METODE SDI

Made Novia Indriani, I Putu Laintarawan, Made Mahesa Adi Pratama
article en

Abstract

The Dawan-Pesinggahan Road section is one of the sections that has the status of a district road in Klungkung Regency. The Dawan Pesinggahan Road section is located in Dawan District, Dawan Village and Pesinggahan Village, which has a length of 3,300 km and an average width of 4.5 m. The Dawan – Pesinggahan Road section has existing conditions in 2021, namely 3,300 km in good condition, 0.9 km in moderate condition and there are conditions of light and heavy damage. In 2022, there will be a lot of road damage which will cause the condition of the road to decline and it is very necessary to assess the condition of the road so that we can find out what measures will be taken to restore road stability on the Dawan-Pesinggahan Road Section. Assessment of road conditions using the SDI method in Klungkung Regency was carried out on the Jl. Dawan – Stopover. The selection of this section as a sample was due to time constraints and the district road section used as a travel center in Klungkung Regency which needs to receive more attention through road management. Apart from that, the section used is a road section that visually has road damage. This research was carried out because there are still damaged roads that need to be treated quickly. This research aims to analyze road conditions, analyze the type of treatment and obtain costs for handling the road section. The data used in the research are primary data and secondary data. Primary data was obtained through a survey of road conditions by measuring road damage, while secondary data was obtained from the community development sector of the Klungkung Regency PUPRPKP Service, namely Klungkung Regency road decrees, Klungkung Regency road maps and basic Klungkung Regency road data. The research stages are, identifying road damage by taking measurements, data recapitulation by processing surveys, data analysis using the SDI method and estimating costs to repair the road. Assessment results for the Jl. Dawan – Pesinggahan Crocodile cracks at 13.54%, random cracks 18.71%, transverse cracks 17.06%, patches 14.66%, holes 12.03% and subsidence 13.24% and the estimated cost required to maintain this road section is IDR. 3,864,775,688.95

Widya TeknikVol. 20(1)
Universitas Hindu Indonesia (ID)
Sustainable cities and communities
Openalex Percentile: Top 78%
Urban Transport Systems Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

PEMELIHARAAN KONSTRUKSI JALAN DENGAN METODE SDI — Made Novia Indriani, I Putu Laintarawan, et al. · Widya Teknik (2024) | TGRS Research Map | TGRS