Introduction. The article examines the international experience of implementing large infrastructure projects in various countries using the “Design-Build” and “Design-Build-Operate” methods. It analyzes the advantages and disadvantages of these approaches and explores the possibility of applying them in infrastructure projects in Ukraine. Problem Statement. The shortcomings of the traditional project implementation method involve sequential completion of design and construction phases, time spent on organizing tenders for each stage, coordinating various contractors, and the distribution of responsibilities between the designer and the builder. Additional time costs may also arise if changes need to be made to the project documentation during construction. Objective. To analyze international experience in implementing infrastructure projects using “Design-Build” and “Design-Build-Operate” contracts. The goal is to identify the advantages and disadvantages of these contracts and determine their potential as an alternative to the traditional method for possible implementation in Ukraine. Materials and Methods. The research is based on analyzing international experiences with

Authors

Publication Details

Journal
Dorogi i mosti
Published
2024-10-09
DOI
https://doi.org/10.36100/dorogimosti2024.30.070
Primary Topic
Law, logistics, and international trade
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of international experience in implementing “Design-Build” and “Design-Build-Operate” contracts

Viktor Komar
2 links
Dorogi i mosti
Law, logistics, and international trade
article

Analysis of international experience in implementing “Design-Build” and “Design-Build-Operate” contracts

Viktor Komar
article en

Abstract

Introduction. The article examines the international experience of implementing large infrastructure projects in various countries using the “Design-Build” and “Design-Build-Operate” methods. It analyzes the advantages and disadvantages of these approaches and explores the possibility of applying them in infrastructure projects in Ukraine. Problem Statement. The shortcomings of the traditional project implementation method involve sequential completion of design and construction phases, time spent on organizing tenders for each stage, coordinating various contractors, and the distribution of responsibilities between the designer and the builder. Additional time costs may also arise if changes need to be made to the project documentation during construction. Objective. To analyze international experience in implementing infrastructure projects using “Design-Build” and “Design-Build-Operate” contracts. The goal is to identify the advantages and disadvantages of these contracts and determine their potential as an alternative to the traditional method for possible implementation in Ukraine. Materials and Methods. The research is based on analyzing international experiences with

Dorogi i mostiVol. 2024(30)
Industry, innovation and infrastructure
Openalex Percentile: Top 67%
Law, logistics, and international trade
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of international experience in implementing “Design-Build” and “Design-Build-Operate” contracts — Viktor Komar · Dorogi i mosti (2024) | TGRS Research Map | TGRS