Design and Cutting Method of Substation Information Model Describing the Primary Equipment and its Connections

Model inconsistency will impede efficient data exchange among different systems. Currently, substations and master stations use different standards to describe the equipment in substations and have established corresponding models respectively. The substation model focuses on logic nodes to describe the equipment data, which is not compatible with the master station model. Therefore, a data point table is necessary to translate the information in different stations. Such a method increases the maintenance cost and reduces the data quality of the communication process. To bypass the communication barriers, this paper established the equipment entity model from the view of the substation primary side, designed the node calling method to achieve the hierarchical management of equipment connections, and proposed the exact and fuzzing match method to achieve efficient model cutting in response to the master station requirements.

Authors

Institutions

Publication Details

Published
2024-09-20
DOI
https://doi.org/10.1109/itnec60942.2024.10733251
Primary Topic
Power Systems and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Design and Cutting Method of Substation Information Model Describing the Primary Equipment and its Connections

J. Li, Zeliang Shen, Renhui Dou, Yan Li et al.
Power Systems and Technologies
article

Design and Cutting Method of Substation Information Model Describing the Primary Equipment and its Connections

J. Li, Zeliang Shen, Renhui Dou, Yan Li, Hui Ren, Yang Sun
article en

Abstract

Model inconsistency will impede efficient data exchange among different systems. Currently, substations and master stations use different standards to describe the equipment in substations and have established corresponding models respectively. The substation model focuses on logic nodes to describe the equipment data, which is not compatible with the master station model. Therefore, a data point table is necessary to translate the information in different stations. Such a method increases the maintenance cost and reduces the data quality of the communication process. To bypass the communication barriers, this paper established the equipment entity model from the view of the substation primary side, designed the node calling method to achieve the hierarchical management of equipment connections, and proposed the exact and fuzzing match method to achieve efficient model cutting in response to the master station requirements.

State Grid Corporation of China (China) (CN), China Electric Power Research Institute
Openalex Percentile: Top 83%
Power Systems and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.