A Reasoning-Based Hyper-Heuristic Model for Reliability Optimization in Medium Voltage Power Distribution Systems

In this work a new Hyper-heuristic Model based on reasoning to solve the Reliability Optimization problem in Medium Voltage Electrical Distribution Systems (MV PDS) is presented. The problem focuses on the optimal location of various types of sectioning /protection equipment (s/p), introducing a new economic assessment for the Cost of Failure, considering not only the Expected Non-Supplied Energy (EENS) but other Reliability Indices based on Customers. If only a single type of s/p equipment were considered, the problem can be solved by applying Possibilistic Dynamic Programming (PDP). However, this approach collapses when there are several types of s/p devices. The solution using single Meta-heuristics has convergence drawbacks, prematurely generating sub-optimal solutions. For this reason, a Model based on a Multi-objective Hyper-heuristic Algorithm is proposed as a general solution, applying it to a real MV PDS to analyze and discuss the results obtained. (Abstract)

Authors

Institutions

Publication Details

Published
2024-09-18
DOI
https://doi.org/10.1109/argencon62399.2024.10735975
Citations
1
Primary Topic
Power System Reliability and Maintenance
Type
article
Field-Weighted Citation Impact
0.36
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Reasoning-Based Hyper-Heuristic Model for Reliability Optimization in Medium Voltage Power Distribution Systems

Gustavo Alejandro Schweickardt, Cristina Bucci
1 citations
Power System Reliability and Maintenance
0.36
article

A Reasoning-Based Hyper-Heuristic Model for Reliability Optimization in Medium Voltage Power Distribution Systems

Gustavo Alejandro Schweickardt, Cristina Bucci
article en
1 citations

Abstract

In this work a new Hyper-heuristic Model based on reasoning to solve the Reliability Optimization problem in Medium Voltage Electrical Distribution Systems (MV PDS) is presented. The problem focuses on the optimal location of various types of sectioning /protection equipment (s/p), introducing a new economic assessment for the Cost of Failure, considering not only the Expected Non-Supplied Energy (EENS) but other Reliability Indices based on Customers. If only a single type of s/p equipment were considered, the problem can be solved by applying Possibilistic Dynamic Programming (PDP). However, this approach collapses when there are several types of s/p devices. The solution using single Meta-heuristics has convergence drawbacks, prematurely generating sub-optimal solutions. For this reason, a Model based on a Multi-objective Hyper-heuristic Algorithm is proposed as a general solution, applying it to a real MV PDS to analyze and discuss the results obtained. (Abstract)

National Technological University (AR), Consejo Nacional de Investigaciones Científicas y Técnicas (AR)
Affordable and clean energy
Openalex Percentile: Top 38%
Power System Reliability and Maintenance
0.36
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A Reasoning-Based Hyper-Heuristic Model for Reliability Optimization in Medium Voltage Power Distribution Systems — Gustavo Alejandro Schweickardt, Cristina Bucci · (2024) | TGRS Research Map | TGRS