Research on primary aluminum production scheduling optimization based on expert system and long-short-term memory network (LSTM)

This article studies the influence of the material and thermal balance of the electrolytic cells in the aluminum production. Specifically, these two metrics reflect the current efficiency, material utilization rate and the lifespan of the electrolytic cells. Therefore, reasonable planning of the amount of siphon aluminum(yield) and production time are two key factors in the aluminum electrolysis process. However, due to the occurrence of numerous emergencies in the actual production process, manual scheduling aluminum production is still a major challenge, which motivate us to develop an LSTM of the rule-based expert system aluminum production decision-making model. First, the input dataset are processed and selected according to the expert system. Then, a deep LSTM model is built. Finally, the output results are planned and maintained based on the expert system. The performance in the experiments also proves that the method is feasible in terms of both accuracy and robustness aspects.

Authors

Institutions

Publication Details

Published
2024-11-04
DOI
https://doi.org/10.1117/12.3054947
Primary Topic
Industrial Technology and Control Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on primary aluminum production scheduling optimization based on expert system and long-short-term memory network (LSTM)

Xueyan Wei, Fatao Qin, Chenggang Yu, Chang Wang et al.
1 links
Industrial Technology and Control Systems
article

Research on primary aluminum production scheduling optimization based on expert system and long-short-term memory network (LSTM)

Xueyan Wei, Fatao Qin, Chenggang Yu, Chang Wang, Xiaoyang Li, Guanglei Zhang, Guangbing Pu
article en

Abstract

This article studies the influence of the material and thermal balance of the electrolytic cells in the aluminum production. Specifically, these two metrics reflect the current efficiency, material utilization rate and the lifespan of the electrolytic cells. Therefore, reasonable planning of the amount of siphon aluminum(yield) and production time are two key factors in the aluminum electrolysis process. However, due to the occurrence of numerous emergencies in the actual production process, manual scheduling aluminum production is still a major challenge, which motivate us to develop an LSTM of the rule-based expert system aluminum production decision-making model. First, the input dataset are processed and selected according to the expert system. Then, a deep LSTM model is built. Finally, the output results are planned and maintained based on the expert system. The performance in the experiments also proves that the method is feasible in terms of both accuracy and robustness aspects.

Institute of New Materials (CN)
Affordable and clean energy
Openalex Percentile: Top 77%
Industrial Technology and Control Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Research on primary aluminum production scheduling optimization based on expert system and long-short-term memory network (LSTM) — Xueyan Wei, Fatao Qin, et al. · (2024) | TGRS Research Map | TGRS