Transformed Towards the Digitalization of 30 Years Mature Field by De-Manning to Reduce Operating Cost (OPEX)

Field XY is a conventional shallow water field, and it is under a mega brownfield and rejuvenation project under PETRONAS Carigali Sdn Bhd—the project's objective is to transform the existing field into a remote operation. Hence, the project's scope included modifying the existing manual operation to a digitalization operation. The field has operated since 1978, and it is located 250 kilometers offshore of Peninsular Malaysia. In summary, the field has been produced for more than 30 years. Therefore, upgrading the existing facilities to minimize the operating cost is essential to continue the production of gas and oil from Field XY. This project objective covers 3 main goals: To transform the current operation to digitalization by upgrading the control system and expanding the internet network. To reduce the operating cost by de-manning the existing B-A Platform and centralizing the operation at the T-A Platform. To reduce the GHG produced during operation by improving the overall process system & installation of the Vapour Recovery Unit (VRU).

Authors

Institutions

Publication Details

Published
2024-11-04
DOI
https://doi.org/10.2118/222353-ms
Primary Topic
Reservoir Engineering and Simulation Methods
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Transformed Towards the Digitalization of 30 Years Mature Field by De-Manning to Reduce Operating Cost (OPEX)

M. Sahir Ahmad Shatiry, M Noraznan Asmadi, Abdullah Embong, Montserrat Ros et al.
Reservoir Engineering and Simulation Methods
article

Transformed Towards the Digitalization of 30 Years Mature Field by De-Manning to Reduce Operating Cost (OPEX)

M. Sahir Ahmad Shatiry, M Noraznan Asmadi, Abdullah Embong, Montserrat Ros, M Fariq Effendi Ramli, Rosmiah Samsul Bahrin
article en

Abstract

Field XY is a conventional shallow water field, and it is under a mega brownfield and rejuvenation project under PETRONAS Carigali Sdn Bhd—the project's objective is to transform the existing field into a remote operation. Hence, the project's scope included modifying the existing manual operation to a digitalization operation. The field has operated since 1978, and it is located 250 kilometers offshore of Peninsular Malaysia. In summary, the field has been produced for more than 30 years. Therefore, upgrading the existing facilities to minimize the operating cost is essential to continue the production of gas and oil from Field XY. This project objective covers 3 main goals: To transform the current operation to digitalization by upgrading the control system and expanding the internet network. To reduce the operating cost by de-manning the existing B-A Platform and centralizing the operation at the T-A Platform. To reduce the GHG produced during operation by improving the overall process system & installation of the Vapour Recovery Unit (VRU).

Petronas (Malaysia) (MY)
Openalex Percentile: Top 74%
Reservoir Engineering and Simulation Methods
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.