How to do Fast-Track Projects

Abstract The ever-increasing fast paced economy brings the need for faster project development and construction. This has led to a term known as "fast-tracked projects" in which the schedule is reduced by shortening and overlapping the design, procurement and construction phases. The objective of this paper will be to provide a practical guideline to project managers and engineers who have been tasked with executing a fast-track project, with particular focus on brownfield projects in the process industry. The scope will cover project management and engineering for fast-track projects, during the concept to detailed design phases. The approach to the paper starts with a literature review of past journal research published on fast-tracked projects and review of the experiences that Hatch has had with fast-tracked projects. Case studies have been prepared, to highlight project management and engineering decisions which succeeded in accelerating the schedule. Pitfalls and recommendations will be identified and future tools to aid fast-track projects will be discussed. The results of analysis of historical vendor quotations and procurement show typical lead times for equipment and materials, allowing engineers to identify long lead equipment and items which need early focus. Observations from the case studies have shown that success in fast-track projects involves setting a fixed basis of design early in the project and making key project scoping decisions as early as possible in the project to minimise changes. Observations have been made on historical projects and how many of the key fast-track practices (from the literature review) were implemented as part of successful fast-tracking; lessons learned and recommendations have been shared in the paper. Observations have also been made about projects which attempted to fast-track by removing of project stage decision gates and/or jumping design stages, which then led to increased re-work/change scope. The cost-quality-schedule of a project can be represented as the three corners of a triangle, which are key drivers on a project. The main conclusion is that the Project Manager and Engineering Teams must plan carefully and have buy-in from all key stakeholders in the project from an early stage on all the key decisions, otherwise one portion of the cost-quality-schedule triangle will always fall behind the others, with the most concerning one being quality, as it is often linked to safety. Clients may have to accept a feasible, fit for purpose design, rather than an optimised design in order to meet a fast-track schedule. There are currently limited engineering guidelines for how to execute the design of a fast-track project. The paper provides additive information in the form of case study examples, practical engineering guidance for the process industry and identifying new technologies, which may aid fast-track projects in the future.

Authors

Institutions

Publication Details

Published
2024-11-04
DOI
https://doi.org/10.2118/222174-ms
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

How to do Fast-Track Projects

Danielle A. Macdonald, B. Lau, H. Bue, L. Kane
BIM and Construction Integration
article

How to do Fast-Track Projects

Danielle A. Macdonald, B. Lau, H. Bue, L. Kane
article en

Abstract

Abstract The ever-increasing fast paced economy brings the need for faster project development and construction. This has led to a term known as "fast-tracked projects" in which the schedule is reduced by shortening and overlapping the design, procurement and construction phases. The objective of this paper will be to provide a practical guideline to project managers and engineers who have been tasked with executing a fast-track project, with particular focus on brownfield projects in the process industry. The scope will cover project management and engineering for fast-track projects, during the concept to detailed design phases. The approach to the paper starts with a literature review of past journal research published on fast-tracked projects and review of the experiences that Hatch has had with fast-tracked projects. Case studies have been prepared, to highlight project management and engineering decisions which succeeded in accelerating the schedule. Pitfalls and recommendations will be identified and future tools to aid fast-track projects will be discussed. The results of analysis of historical vendor quotations and procurement show typical lead times for equipment and materials, allowing engineers to identify long lead equipment and items which need early focus. Observations from the case studies have shown that success in fast-track projects involves setting a fixed basis of design early in the project and making key project scoping decisions as early as possible in the project to minimise changes. Observations have been made on historical projects and how many of the key fast-track practices (from the literature review) were implemented as part of successful fast-tracking; lessons learned and recommendations have been shared in the paper. Observations have also been made about projects which attempted to fast-track by removing of project stage decision gates and/or jumping design stages, which then led to increased re-work/change scope. The cost-quality-schedule of a project can be represented as the three corners of a triangle, which are key drivers on a project. The main conclusion is that the Project Manager and Engineering Teams must plan carefully and have buy-in from all key stakeholders in the project from an early stage on all the key decisions, otherwise one portion of the cost-quality-schedule triangle will always fall behind the others, with the most concerning one being quality, as it is often linked to safety. Clients may have to accept a feasible, fit for purpose design, rather than an optimised design in order to meet a fast-track schedule. There are currently limited engineering guidelines for how to execute the design of a fast-track project. The paper provides additive information in the form of case study examples, practical engineering guidance for the process industry and identifying new technologies, which may aid fast-track projects in the future.

Hatch (Canada) (CA), Emirates Foundation (AE)
Industry, innovation and infrastructure
Openalex Percentile: Top 80%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.