Successful Deployment of Ultra Smartwell Enable Maximum Reservoir Contact for Enhanced Production Recovery

Abstract The focus of this paper is the effective implementation of an "ULTRA SMARTWELL", a smart completion system integrated with advanced remote sensing and monitoring technology, employed across a substantial long horizontal drain section. It encompasses the utilization of the longest intelligent completion design ever utilized in the UAE, extending 18,800 feet, from an offshore jack-up rig situated in Offshore Abu Dhabi, UAE. This approach optimized on achieving maximum reservoir contact, leading to enhanced production recovery During the concept selection phase, a thorough engineering feasibility study was conducted. Traditional intelligent completions typically require drilling and completing various horizontal drains, increasing operational risks and costs. The innovative "ULTRA SMARTWELL" design calls for a single 8-1/2 in horizontal well and a non-cemented 7in liner with swell packers for zonal isolation and segmentation. This approach includes remote sensing and live monitoring to manage any water or gas breakthrough, greatly enhancing oil recovery. It also boasts a design that minimizes the need for interventions because surface-controlled downhole valves and gauges allow for remote well performance monitoring. The paper will examine various procedures and difficulties encountered while implementing the completion string in the lengthy horizontal segment, following post-completion intervention. This innovative deployment method also achieved considerable capital expenditure savings by cutting approx.16 days from rig operations. Additionally, a notable increase in value was achieved with enhanced hydrocarbon recovery totaling up to ~4.67 million stock tank barrels (MMSTB), attributable to remote sensing and the capacity to manage high gas/oil ratios and water/gas entry, thereby prolonging the productive life of the well.

Authors

Institutions

Publication Details

Published
2024-11-04
DOI
https://doi.org/10.2118/222538-ms
Primary Topic
Reservoir Engineering and Simulation Methods
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Successful Deployment of Ultra Smartwell Enable Maximum Reservoir Contact for Enhanced Production Recovery

O. T. Mirza, Navindran Juvarajah, Abdel Moez M. Sabri, Talha Saqib et al.
Reservoir Engineering and Simulation Methods
article

Successful Deployment of Ultra Smartwell Enable Maximum Reservoir Contact for Enhanced Production Recovery

O. T. Mirza, Navindran Juvarajah, Abdel Moez M. Sabri, Talha Saqib, Osama Keshtta, Yousof Al-Hammadi, Reem Nasser, S. Hajri
article en

Abstract

Abstract The focus of this paper is the effective implementation of an "ULTRA SMARTWELL", a smart completion system integrated with advanced remote sensing and monitoring technology, employed across a substantial long horizontal drain section. It encompasses the utilization of the longest intelligent completion design ever utilized in the UAE, extending 18,800 feet, from an offshore jack-up rig situated in Offshore Abu Dhabi, UAE. This approach optimized on achieving maximum reservoir contact, leading to enhanced production recovery During the concept selection phase, a thorough engineering feasibility study was conducted. Traditional intelligent completions typically require drilling and completing various horizontal drains, increasing operational risks and costs. The innovative "ULTRA SMARTWELL" design calls for a single 8-1/2 in horizontal well and a non-cemented 7in liner with swell packers for zonal isolation and segmentation. This approach includes remote sensing and live monitoring to manage any water or gas breakthrough, greatly enhancing oil recovery. It also boasts a design that minimizes the need for interventions because surface-controlled downhole valves and gauges allow for remote well performance monitoring. The paper will examine various procedures and difficulties encountered while implementing the completion string in the lengthy horizontal segment, following post-completion intervention. This innovative deployment method also achieved considerable capital expenditure savings by cutting approx.16 days from rig operations. Additionally, a notable increase in value was achieved with enhanced hydrocarbon recovery totaling up to ~4.67 million stock tank barrels (MMSTB), attributable to remote sensing and the capacity to manage high gas/oil ratios and water/gas entry, thereby prolonging the productive life of the well.

Abu Dhabi National Oil (United Arab Emirates) (AE)
Openalex Percentile: Top 74%
Reservoir Engineering and Simulation Methods
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Successful Deployment of Ultra Smartwell Enable Maximum Reservoir Contact for Enhanced Production Recovery — O. T. Mirza, Navindran Juvarajah, et al. · (2024) | TGRS Research Map | TGRS