Challenges and Mitigations in an End to End Well Test Validation Work Process Post Integrated Smart Field Asset Model Implementation

Abstract This paper will demonstrate the challenges faced by the end users in utilizing the well test validation end to end workflow within the integrated production platform. Therefore, along with the validation of the large number of well tests on daily basis, seamless sync of bi-directional data flow between the corporate database and asset optimization tool is challenging and critical. The closed-loop well test validation workflow was implemented to overcome the challenges of disconnect between the corporate database and the asset optimization tool. In this automated workflow. Within this process, the well tests are fetched from the corporate database then automated validation is performed within the asset optimization tool. The validation status is written back to the corporate database. This bi-direction data flow requires a proper and precise sync between the scheduler of both the corporate database and the asset optimization tool. The user-defined dashboard was created to highlight the misalignment/ broken loop in real-time. It was observed that the writing back of the validation status to the corporate database was broken. The cause of the issue was identified as the change in the scheduler time of the corporate database which broke the sequential automated schedular task of the asset optimization tool. As a result, the disconnect between the corporate database and the asset optimization tool was highlighted on a real-time basis. This reduces the system downtime, and manhours spent on troubleshooting. It has also enabled users to utilize more efficiently the data management (like validation status of Well test), It also creates an environment of a single source of record (SoR) thus enabling utilization of the more accurate and validated data by the different departments within a large asset. This resulted in maintaining an overall higher Well Test KPI %. A process was established in collaboration with the stakeholders from the corporate database to identify this gap in the sync process. The required changes in the sequential schedular time were made. Both the servers are in sync to update the well test changes, any change in either of the server would affect the other. Incorporating the manage by exception philosophy with the closed loop well test validation workflow aligns with the corporate vision of using an integrated asset operation Model (IAOM) for providing end users tremendous opportunities related to system optimization and empower the engineer to process bulk data rapidly. This also supports the user's drive of standardized process orientated.

Authors

Institutions

Publication Details

Published
2024-11-04
DOI
https://doi.org/10.2118/222603-ms
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Challenges and Mitigations in an End to End Well Test Validation Work Process Post Integrated Smart Field Asset Model Implementation

Fahed Ahmed AlHarethi, Avnish Kumar Mathur, Sarath Konkati, Manar Elabrashy et al.
Drilling and Well Engineering
article

Challenges and Mitigations in an End to End Well Test Validation Work Process Post Integrated Smart Field Asset Model Implementation

Fahed Ahmed AlHarethi, Avnish Kumar Mathur, Sarath Konkati, Manar Elabrashy, Sameer Siddiqui, Mansi Jani, Shemaisa Alsenaidi, Ayesha Alsaeedi, Maryam Alhammadi, Mohamed Alzeyoudi, Mohammed Albadi, Rashed Alhammadi
article en

Abstract

Abstract This paper will demonstrate the challenges faced by the end users in utilizing the well test validation end to end workflow within the integrated production platform. Therefore, along with the validation of the large number of well tests on daily basis, seamless sync of bi-directional data flow between the corporate database and asset optimization tool is challenging and critical. The closed-loop well test validation workflow was implemented to overcome the challenges of disconnect between the corporate database and the asset optimization tool. In this automated workflow. Within this process, the well tests are fetched from the corporate database then automated validation is performed within the asset optimization tool. The validation status is written back to the corporate database. This bi-direction data flow requires a proper and precise sync between the scheduler of both the corporate database and the asset optimization tool. The user-defined dashboard was created to highlight the misalignment/ broken loop in real-time. It was observed that the writing back of the validation status to the corporate database was broken. The cause of the issue was identified as the change in the scheduler time of the corporate database which broke the sequential automated schedular task of the asset optimization tool. As a result, the disconnect between the corporate database and the asset optimization tool was highlighted on a real-time basis. This reduces the system downtime, and manhours spent on troubleshooting. It has also enabled users to utilize more efficiently the data management (like validation status of Well test), It also creates an environment of a single source of record (SoR) thus enabling utilization of the more accurate and validated data by the different departments within a large asset. This resulted in maintaining an overall higher Well Test KPI %. A process was established in collaboration with the stakeholders from the corporate database to identify this gap in the sync process. The required changes in the sequential schedular time were made. Both the servers are in sync to update the well test changes, any change in either of the server would affect the other. Incorporating the manage by exception philosophy with the closed loop well test validation workflow aligns with the corporate vision of using an integrated asset operation Model (IAOM) for providing end users tremendous opportunities related to system optimization and empower the engineer to process bulk data rapidly. This also supports the user's drive of standardized process orientated.

Weatherford (Norway) (NO), Abu Dhabi National Oil (United Arab Emirates) (AE)
Industry, innovation and infrastructure
Openalex Percentile: Top 74%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.