Gas lift is one of the most crucial components for achieving and maintaining production targets for ADNOC Offshore assets. One major factor for this is the utilization of dual completions, whereby two production zones can be produced via a single casing conduit. Gas lift within dual completion wells is extremely challenging with conventional pressure operated gas lift valves due to the dynamic downhole conditions, fluctuating pressure and temperature and the inability to individually control the gas injection rate to each production string. In most cases, the string dedicated to the formation with lower productivity and reservoir pressure tends to "rob" the injection gas from other. Furthermore, well intervention is required to change out the gas lift valve orifice as downhole conditions evolve over the life of the well. To maximize the gas lift performance of the dual completion well, a Digital Gas Lift System (DIAL) was applied to a dual completion well on both production strings. A suitable dual completion well candidate was selected in the Green Field SS. Once the candidate was selected a comprehensive design review was completed. The gas lift design determined that two DIAL Gas Lift Units were to be installed on each string. Orifice port sizes were selected to ensure that the optimum gas injection rate would be delivered. The DIAL Units are connected to a Surface Control System (SCS) which would enable surface control of the electric valves downhole. Each DIAL Unit features pressure and temperature gauges and valve position sensing to allow the operator to determine the Vertical Lift Performance (VLP) of each string, casing gradient and gas injection rate in real time. Furthermore, the DIAL System was integrated with the Field Distributed Control System (DCS), allowing for remote data driven decision making. A full System Integration Test (SIT) was completed ahead of the field installation, integration, and commissioning. The DIAL System was successfully installed and commissioned. Through the ability to monitor and control the gas injection rate throughout the well life, the implementation of the DIAL System has resulted in substantial net present value generation through real time production optimization and the avoidance of well intervention, associated costs and deferred production required for gas lift valve change out and Flowing Gradient Surveys (FGS).

Authors

Institutions

Publication Details

Published
2024-11-04
DOI
https://doi.org/10.2118/222714-ms
Primary Topic
Smart Parking Systems Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

First Dual Completion Digital Gas Lift System Installed in Middle East

Steven Faux, Emad Salama, Cristiano Caproni, Abdel BenAmara et al.
1 links
Smart Parking Systems Research
article

First Dual Completion Digital Gas Lift System Installed in Middle East

Steven Faux, Emad Salama, Cristiano Caproni, Abdel BenAmara, Geoff David Cannon, Mohammad Abdulla, F. N Al Zaabi, A. O Al Sereidi, AA Alshamsi, R. M Fonseca
article en

Abstract

Gas lift is one of the most crucial components for achieving and maintaining production targets for ADNOC Offshore assets. One major factor for this is the utilization of dual completions, whereby two production zones can be produced via a single casing conduit. Gas lift within dual completion wells is extremely challenging with conventional pressure operated gas lift valves due to the dynamic downhole conditions, fluctuating pressure and temperature and the inability to individually control the gas injection rate to each production string. In most cases, the string dedicated to the formation with lower productivity and reservoir pressure tends to "rob" the injection gas from other. Furthermore, well intervention is required to change out the gas lift valve orifice as downhole conditions evolve over the life of the well. To maximize the gas lift performance of the dual completion well, a Digital Gas Lift System (DIAL) was applied to a dual completion well on both production strings. A suitable dual completion well candidate was selected in the Green Field SS. Once the candidate was selected a comprehensive design review was completed. The gas lift design determined that two DIAL Gas Lift Units were to be installed on each string. Orifice port sizes were selected to ensure that the optimum gas injection rate would be delivered. The DIAL Units are connected to a Surface Control System (SCS) which would enable surface control of the electric valves downhole. Each DIAL Unit features pressure and temperature gauges and valve position sensing to allow the operator to determine the Vertical Lift Performance (VLP) of each string, casing gradient and gas injection rate in real time. Furthermore, the DIAL System was integrated with the Field Distributed Control System (DCS), allowing for remote data driven decision making. A full System Integration Test (SIT) was completed ahead of the field installation, integration, and commissioning. The DIAL System was successfully installed and commissioned. Through the ability to monitor and control the gas injection rate throughout the well life, the implementation of the DIAL System has resulted in substantial net present value generation through real time production optimization and the avoidance of well intervention, associated costs and deferred production required for gas lift valve change out and Flowing Gradient Surveys (FGS).

Arizona Oncology Foundation (US)
Openalex Percentile: Top 80%
Smart Parking Systems Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.