First Dual Completion Digital Gas Lift System Installed in Middle East
Gas lift is one of the most crucial components for achieving and maintaining production targets for ADNOC Offshore assets. One major factor for this is the utilization of dual completions, whereby two production zones can be produced via a single casing conduit. Gas lift within dual completion wells is extremely challenging with conventional pressure operated gas lift valves due to the dynamic downhole conditions, fluctuating pressure and temperature and the inability to individually control the gas injection rate to each production string. In most cases, the string dedicated to the formation with lower productivity and reservoir pressure tends to "rob" the injection gas from other. Furthermore, well intervention is required to change out the gas lift valve orifice as downhole conditions evolve over the life of the well. To maximize the gas lift performance of the dual completion well, a Digital Gas Lift System (DIAL) was applied to a dual completion well on both production strings. A suitable dual completion well candidate was selected in the Green Field SS. Once the candidate was selected a comprehensive design review was completed. The gas lift design determined that two DIAL Gas Lift Units were to be installed on each string. Orifice port sizes were selected to ensure that the optimum gas injection rate would be delivered. The DIAL Units are connected to a Surface Control System (SCS) which would enable surface control of the electric valves downhole. Each DIAL Unit features pressure and temperature gauges and valve position sensing to allow the operator to determine the Vertical Lift Performance (VLP) of each string, casing gradient and gas injection rate in real time. Furthermore, the DIAL System was integrated with the Field Distributed Control System (DCS), allowing for remote data driven decision making. A full System Integration Test (SIT) was completed ahead of the field installation, integration, and commissioning. The DIAL System was successfully installed and commissioned. Through the ability to monitor and control the gas injection rate throughout the well life, the implementation of the DIAL System has resulted in substantial net present value generation through real time production optimization and the avoidance of well intervention, associated costs and deferred production required for gas lift valve change out and Flowing Gradient Surveys (FGS).
Authors
- Steven Faux (ORCID: https://orcid.org/0000-0001-8846-216X)
- Emad Salama (ORCID: https://orcid.org/0000-0001-8582-5025)
- Cristiano Caproni
- Abdel BenAmara
- Geoff David Cannon
- Mohammad Abdulla
- F. N Al Zaabi
- A. O Al Sereidi
- AA Alshamsi
- R. M Fonseca
Institutions
- Arizona Oncology Foundation (US)
Publication Details
- Published
- 2024-11-04
- DOI
- https://doi.org/10.2118/222714-ms
- Primary Topic
- Smart Parking Systems Research
- Type
- article
- Field-Weighted Citation Impact
- 0.00