Critical Success Factors for Preventing Commissioning and Start-Up Schedule Overrun in Megaprojects

Oil and gas megaprojects are unique, associated with high execution cost and long execution schedules. The Commissioning and Start-up (CSU) delivery of such projects in offshore environment is a complex task. This is mainly because of harsh offshore environment, logistics limitations, integration with producing fields, uncertainty in subsurface data, design flaws, construction errors, etc. This paper analyzes the actual delivery of CSU in offshore oil and gas megaproject. In addition, it shares with the industry the best practices, mitigations, and recommendations for adoption. A series of Root Cause Analysis (RCA) sessions were held with subject matter experts (SMEs) from different disciplines and stakeholders such as engineering, operation, reliability, commissioning, and vendors. Moreover, statistical analysis was conducted on the RCA outcomes to categorize them by relevancy. The root cause categories are feedstock composition changes, engineering flaws, construction errors, manufacturing defects, human errors, and inadequate maintenance. In addition, these categories were further rationalized and coupled with schedule analysis to understand the impact of each root cause category on CSU schedule. Finally, insights were drawn from this analysis in the form of project management lessons and best practices. It is worth noting that the offshore execution of this project took place during the peak of COVID-19 pandemic. The productivity, resources mobilization, and material delivery were heavily impacted due to global lockdowns and changing standard operating procedures imposed by authorities to control the outbreak. The impact from COVID-19 was considerable during the offshore construction phase, which is alternatively known as hook-up phase prior to achieving Ready for Start-up (RFSU) state. It is because the construction progress heavily depends on labor, unlike the CSU progress post RFSU which heavily depends on the actual feedstock properties, design quality, and construction quality. Therefore, the impact from COVID-19 was neglected in this analysis because the paper focuses on the performance of CSU post RFSU.

Authors

Institutions

Publication Details

Published
2024-11-04
DOI
https://doi.org/10.2118/222781-ms
Primary Topic
Technology Assessment and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Critical Success Factors for Preventing Commissioning and Start-Up Schedule Overrun in Megaprojects

Akbal Abu, M. Gaberalla Elarafi, Nazia Malik
Technology Assessment and Management
article

Critical Success Factors for Preventing Commissioning and Start-Up Schedule Overrun in Megaprojects

Akbal Abu, M. Gaberalla Elarafi, Nazia Malik
article en

Abstract

Oil and gas megaprojects are unique, associated with high execution cost and long execution schedules. The Commissioning and Start-up (CSU) delivery of such projects in offshore environment is a complex task. This is mainly because of harsh offshore environment, logistics limitations, integration with producing fields, uncertainty in subsurface data, design flaws, construction errors, etc. This paper analyzes the actual delivery of CSU in offshore oil and gas megaproject. In addition, it shares with the industry the best practices, mitigations, and recommendations for adoption. A series of Root Cause Analysis (RCA) sessions were held with subject matter experts (SMEs) from different disciplines and stakeholders such as engineering, operation, reliability, commissioning, and vendors. Moreover, statistical analysis was conducted on the RCA outcomes to categorize them by relevancy. The root cause categories are feedstock composition changes, engineering flaws, construction errors, manufacturing defects, human errors, and inadequate maintenance. In addition, these categories were further rationalized and coupled with schedule analysis to understand the impact of each root cause category on CSU schedule. Finally, insights were drawn from this analysis in the form of project management lessons and best practices. It is worth noting that the offshore execution of this project took place during the peak of COVID-19 pandemic. The productivity, resources mobilization, and material delivery were heavily impacted due to global lockdowns and changing standard operating procedures imposed by authorities to control the outbreak. The impact from COVID-19 was considerable during the offshore construction phase, which is alternatively known as hook-up phase prior to achieving Ready for Start-up (RFSU) state. It is because the construction progress heavily depends on labor, unlike the CSU progress post RFSU which heavily depends on the actual feedstock properties, design quality, and construction quality. Therefore, the impact from COVID-19 was neglected in this analysis because the paper focuses on the performance of CSU post RFSU.

Petronas (Malaysia) (MY), Tenaga Nasional Berhad (Malaysia) (MY)
Openalex Percentile: Top 77%
Technology Assessment and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.