Deployment of the Longest 9.625-in X 12.25-in Non-Directional Casing While Drilling (CWD) Worldwide Through Unstable Formations in a Production Hole Section in Adnoc Onshore. A Case Study in Drilling Efficiency and Well Integrity

Abstract Conventional drilling methods encountered serious operational challenges while drilling 12.25 in. production hole sections, such as wellbore instability and drilling fluid losses across aquifers. These challenges affected both the drilling productivity and the well integrity. The adoption of Casing While Drilling (CWD) was a significant paradigm shift in resolving these issues by maintaining well integrity and improving well delivery performance. This paper will illustrate how the CWD technology enabled drilling the longest 12.25 in. by 9.625 in. section in one run through unstable aquifer formations, saving 1.2 days of rig time and attaining achieving cementing quality The Non-Directional CWD Technology was deployed in a vertical production borehole section. The CWD used a casing string with a drillable body PDC bit and solid body centralizers for cementing. The approach emphasized careful engineering planning and preparation stages, customized to the requirements to overcome the main challenges for the CWD deployment in pilot stage for final evaluation: Drilling the section in one run and ensuring well integrity across aquifer zones during the cementing job.Drilling dynamics, hydraulics, bit design, offset well and casing centralization analysis were the keys to assess the feasibility of the CWD application through interbedded and unstable formations.Drilling with casing through highly interbedded zones with different hardnesses and mechanical properties The CWD operation was finished in a single run with Zero QHSE incidents and minimum exposure of personal to manual handling of heavy tubulars enhancing rig crew safety. The successful CWD implementation resulted in a time-saving of 1.27 rig days, in a production interval drilled in a single run (5,175 feet) through interbedded formations at a competitive Rate Of Penetration (ROP) of 47 feet per hour, enabling this to become the longest Non-Directional CWD worldwide.The ROP was lower than the conventional drilling ROP in this application. However, the savings were mainly attributed to the elimination of casing-running flat time and Non-Productive Time (NPT) associated with clearing tight spots, wiper trips and water collection due to losses.The verticality was maintained at an average inclination of 0.3 degrees and a maximum displacement of 42 feet.The encountered losses were effectively reduced from 350 barrels per hour to 200 barrels per hour, demonstrating the plastering and wellbore strengthening effect of CWD which resulted in the subsequently good cement bond log across the aquifer formations.Exceptional cement bonding was maintained around the 9.625 -in casing indicative of good hole quality despite the significant dynamic drilling fluid losses.

Authors

Institutions

Publication Details

Published
2024-11-04
DOI
https://doi.org/10.2118/222756-ms
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Deployment of the Longest 9.625-in X 12.25-in Non-Directional Casing While Drilling (CWD) Worldwide Through Unstable Formations in a Production Hole Section in Adnoc Onshore. A Case Study in Drilling Efficiency and Well Integrity

Nader Jouzy, Jeremy Halma, Mazin Al Reyami, Khalid Ahmed Alwahedi et al.
Drilling and Well Engineering
article

Deployment of the Longest 9.625-in X 12.25-in Non-Directional Casing While Drilling (CWD) Worldwide Through Unstable Formations in a Production Hole Section in Adnoc Onshore. A Case Study in Drilling Efficiency and Well Integrity

Nader Jouzy, Jeremy Halma, Mazin Al Reyami, Khalid Ahmed Alwahedi, Joey Roberie, B. Kodiah, R Escobar Bethancourt, Talgat Kosset, A. V. Balen, R. K. Aljabery, D. Syafitri, K. Alsaweafi, T. Faghaly, U. Ameh
article en

Abstract

Abstract Conventional drilling methods encountered serious operational challenges while drilling 12.25 in. production hole sections, such as wellbore instability and drilling fluid losses across aquifers. These challenges affected both the drilling productivity and the well integrity. The adoption of Casing While Drilling (CWD) was a significant paradigm shift in resolving these issues by maintaining well integrity and improving well delivery performance. This paper will illustrate how the CWD technology enabled drilling the longest 12.25 in. by 9.625 in. section in one run through unstable aquifer formations, saving 1.2 days of rig time and attaining achieving cementing quality The Non-Directional CWD Technology was deployed in a vertical production borehole section. The CWD used a casing string with a drillable body PDC bit and solid body centralizers for cementing. The approach emphasized careful engineering planning and preparation stages, customized to the requirements to overcome the main challenges for the CWD deployment in pilot stage for final evaluation: Drilling the section in one run and ensuring well integrity across aquifer zones during the cementing job.Drilling dynamics, hydraulics, bit design, offset well and casing centralization analysis were the keys to assess the feasibility of the CWD application through interbedded and unstable formations.Drilling with casing through highly interbedded zones with different hardnesses and mechanical properties The CWD operation was finished in a single run with Zero QHSE incidents and minimum exposure of personal to manual handling of heavy tubulars enhancing rig crew safety. The successful CWD implementation resulted in a time-saving of 1.27 rig days, in a production interval drilled in a single run (5,175 feet) through interbedded formations at a competitive Rate Of Penetration (ROP) of 47 feet per hour, enabling this to become the longest Non-Directional CWD worldwide.The ROP was lower than the conventional drilling ROP in this application. However, the savings were mainly attributed to the elimination of casing-running flat time and Non-Productive Time (NPT) associated with clearing tight spots, wiper trips and water collection due to losses.The verticality was maintained at an average inclination of 0.3 degrees and a maximum displacement of 42 feet.The encountered losses were effectively reduced from 350 barrels per hour to 200 barrels per hour, demonstrating the plastering and wellbore strengthening effect of CWD which resulted in the subsequently good cement bond log across the aquifer formations.Exceptional cement bonding was maintained around the 9.625 -in casing indicative of good hole quality despite the significant dynamic drilling fluid losses.

Abu Dhabi National Oil (United Arab Emirates) (AE)
Openalex Percentile: Top 74%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.