Enhanced 9.625-Inches Cementing Practices Proved the Best Well Integrity Solutions and Eliminates the 7-InchesTieback Options in Onshore Oil Field in the United Arab Emirates

Abstract Conventional drilling methods in UAE onshore oil fields have faced significant challenges, including wellbore instability and fluid losses across aquifers during the drilling of 12.25-inch intermediate hole sections. These challenges impacted drilling productivity and compromise well integrity, particularly during the cementing of 9.625-incheds casing strings. The conventional practice of using repeated cement/sodium silicate plugs to address these issues has proven insufficient, often necessitating the use of a 7-inch casing tieback to ensure well integrity throughout the well’s lifecycle. This paper presents enhanced 9 5/8-inch cementing practices designed to eliminate the need for a 7-inch tieback while preserving the option for future side tracking. The adoption of these enhanced practices has led to significant cost savings, reduced well durations, and improved well integrity. By detailing the methodology, results, and implications, this paper provides valuable insights into modern cementing practices and their impact on drilling efficiency and cost management.

Authors

Institutions

Publication Details

Published
2024-11-04
DOI
https://doi.org/10.2118/222852-ms
Citations
2
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.67
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Enhanced 9.625-Inches Cementing Practices Proved the Best Well Integrity Solutions and Eliminates the 7-InchesTieback Options in Onshore Oil Field in the United Arab Emirates

Mazin Al Reyami, Mohamed Alshehhi, Faisal Khan, Mushtaq Ahmad et al.
2 citations
Drilling and Well Engineering
0.67
article

Enhanced 9.625-Inches Cementing Practices Proved the Best Well Integrity Solutions and Eliminates the 7-InchesTieback Options in Onshore Oil Field in the United Arab Emirates

Mazin Al Reyami, Mohamed Alshehhi, Faisal Khan, Mushtaq Ahmad, L. Valencerina, Fesarama Felaza, Ugbedeojo Ameh
article en
2 citations

Abstract

Abstract Conventional drilling methods in UAE onshore oil fields have faced significant challenges, including wellbore instability and fluid losses across aquifers during the drilling of 12.25-inch intermediate hole sections. These challenges impacted drilling productivity and compromise well integrity, particularly during the cementing of 9.625-incheds casing strings. The conventional practice of using repeated cement/sodium silicate plugs to address these issues has proven insufficient, often necessitating the use of a 7-inch casing tieback to ensure well integrity throughout the well’s lifecycle. This paper presents enhanced 9 5/8-inch cementing practices designed to eliminate the need for a 7-inch tieback while preserving the option for future side tracking. The adoption of these enhanced practices has led to significant cost savings, reduced well durations, and improved well integrity. By detailing the methodology, results, and implications, this paper provides valuable insights into modern cementing practices and their impact on drilling efficiency and cost management.

Abu Dhabi National Oil (United Arab Emirates) (AE)
Openalex Percentile: Top 30%
Drilling and Well Engineering
0.67
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.