Solar Power Plant Optimization using Automatic Transfer Switch (ATS) and Low Voltage Disconnect (LVD)

The automatic system model uses a Solar Charge Controller (SCC) to turn off the solar panel system at the minimum battery point so that the battery is safe and durable and an Automatic Transfer Switch (ATS) to automatically transfer the electricity network from State Electricity Company or Grid or solar panels. In this study, Solar Panel Priority Grid electricity is used if the solar panel is insufficient and hybrid system with solar panel priority with 2 cut out battery usage. The results of this study are 450WP Solar Panel, 100A SCC MPPT, 12V/100Ah Battery, and 3000 Watt Modified Sine Wave Inverter, Miniature Circuit Breaker, Contactor, Relay Switch, Time Delay Relay and Indicators. The results of the switching process test between the Solar Power Plant source and grid with ATS control can run automatically in Grid Priority Mode, meaning Solar Power Plant as a backup, or Solar Power Plant Priority Mode where the grid source is used as a power backup system. In the Battery Capacity Optimization System, Low Voltage Disconnect (LVD) Protection can work well, namely it can cut off the voltage from the inverter if the battery is in a low voltage state at a rating below 10.8 Volts, Auto Cut Charging Protection testing can charge the battery up to 13.8 Volts and Cycle Use, namely the process of this system can work to store energy while releasing energy to run the load. The results of this study can be used as a reference for the best choice of the most efficient Solar Power Plant system.

Authors

Institutions

Publication Details

Journal
JEECOM Journal of Electrical Engineering and Computer
Published
2024-10-04
DOI
https://doi.org/10.33650/jeecom.v6i2.9571
Primary Topic
Photovoltaic System Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Solar Power Plant Optimization using Automatic Transfer Switch (ATS) and Low Voltage Disconnect (LVD)

Muhammad Agil Haikal, Machrus Ali, Askan Askan, Budiman Budiman
JEECOM Journal of Electrical Engineering and Computer
Photovoltaic System Optimization Techniques
article

Solar Power Plant Optimization using Automatic Transfer Switch (ATS) and Low Voltage Disconnect (LVD)

Muhammad Agil Haikal, Machrus Ali, Askan Askan, Budiman Budiman
article en

Abstract

The automatic system model uses a Solar Charge Controller (SCC) to turn off the solar panel system at the minimum battery point so that the battery is safe and durable and an Automatic Transfer Switch (ATS) to automatically transfer the electricity network from State Electricity Company or Grid or solar panels. In this study, Solar Panel Priority Grid electricity is used if the solar panel is insufficient and hybrid system with solar panel priority with 2 cut out battery usage. The results of this study are 450WP Solar Panel, 100A SCC MPPT, 12V/100Ah Battery, and 3000 Watt Modified Sine Wave Inverter, Miniature Circuit Breaker, Contactor, Relay Switch, Time Delay Relay and Indicators. The results of the switching process test between the Solar Power Plant source and grid with ATS control can run automatically in Grid Priority Mode, meaning Solar Power Plant as a backup, or Solar Power Plant Priority Mode where the grid source is used as a power backup system. In the Battery Capacity Optimization System, Low Voltage Disconnect (LVD) Protection can work well, namely it can cut off the voltage from the inverter if the battery is in a low voltage state at a rating below 10.8 Volts, Auto Cut Charging Protection testing can charge the battery up to 13.8 Volts and Cycle Use, namely the process of this system can work to store energy while releasing energy to run the load. The results of this study can be used as a reference for the best choice of the most efficient Solar Power Plant system.

JEECOM Journal of Electrical Engineering and ComputerVol. 6(2)
Universitas Darul Ulum (ID)
Bureau of Planning and International Cooperation, Ministry of National Education
Openalex Percentile: Top 89%
Photovoltaic System Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Solar Power Plant Optimization using Automatic Transfer Switch (ATS) and Low Voltage Disconnect (LVD) — Muhammad Agil Haikal, Machrus Ali, et al. · JEECOM Journal of Electrical Engineering and Computer (2024) | TGRS Research Map | TGRS