The Mission Time Analysis in Level 2 Probabilistic Safety Assessment of the Third-Generation Nuclear Power Plant

Abstract Mission times have to be defined for the probabilistic system or equipment failure analysis. Severe accident mitigating systems may need to be in operation for a long time period, thus mission time considered in Level-2 probabilistic safety assessment (L2PSA) is usually longer than in Level-1 probabilistic safety assessment (LIPSA). By simplication, the mission times in the LIPSA are often defined globally as a maximized delay before obtaining a stable state without core damage. A common mission time is often defined as 24 hours for all systems and all accidents in LIPSA. L2PSA has another perspective. In practice, most LIPSAs with the issue of containment challenge due to core concrete interaction which may pressurize the containment or melt through the containment bottom within typical time scales of one to several days. Due to the complexity of the severe accidents and the diversification of the mitigation measures, there is no common time in L2PSA. Different times are used, like 24 hours or 72 hours. Selection principles of the mission time in L2PSA were researched and the modeling methods were developed. As an example of generation III NPP, the mission time was chosen and modeled, and the sensitivity was analyzed.

Authors

Institutions

Publication Details

Published
2024-08-04
DOI
https://doi.org/10.1115/icone31-135680
Primary Topic
Risk and Safety Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Mission Time Analysis in Level 2 Probabilistic Safety Assessment of the Third-Generation Nuclear Power Plant

Yubao Zhong, Jing Liu, Shujie Guo
Risk and Safety Analysis
article

The Mission Time Analysis in Level 2 Probabilistic Safety Assessment of the Third-Generation Nuclear Power Plant

Yubao Zhong, Jing Liu, Shujie Guo
article en

Abstract

Abstract Mission times have to be defined for the probabilistic system or equipment failure analysis. Severe accident mitigating systems may need to be in operation for a long time period, thus mission time considered in Level-2 probabilistic safety assessment (L2PSA) is usually longer than in Level-1 probabilistic safety assessment (LIPSA). By simplication, the mission times in the LIPSA are often defined globally as a maximized delay before obtaining a stable state without core damage. A common mission time is often defined as 24 hours for all systems and all accidents in LIPSA. L2PSA has another perspective. In practice, most LIPSAs with the issue of containment challenge due to core concrete interaction which may pressurize the containment or melt through the containment bottom within typical time scales of one to several days. Due to the complexity of the severe accidents and the diversification of the mitigation measures, there is no common time in L2PSA. Different times are used, like 24 hours or 72 hours. Selection principles of the mission time in L2PSA were researched and the modeling methods were developed. As an example of generation III NPP, the mission time was chosen and modeled, and the sensitivity was analyzed.

Xi'an Jiaotong University (CN)
Openalex Percentile: Top 81%
Risk and Safety Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.