Rainfall Duration’s Impact on Mining Earthmoving Equipment Performance – Case Study at PT. BUMA GEO-AJE, South Kalimantan

This study investigates the impact of rainfall duration on the performance of earthmoving equipment at PT BUMA, GEO-AJE, South Kalimantan. Data from April 2023 covering 29 days were analyzed using SPSS 22 and Origin 2024. The study revealed a 7.06637% decrease in excavator and dump truck efficiency per hour of rainfall. Cycle times were increased by 0.15122 minutes for excavators and 4.50034 minutes for dump trucks per hour of rain. Moreover, excavator productivity declined by 1138.82900 bcm/day and dump truck productivity by 176.21836 bcm/day. These results highlight the necessity of accounting for rainfall in mining operations, especially in productivity forecasts and equipment management.

Authors

Institutions

Publication Details

Journal
Jurnal Teknik Sipil dan Perencanaan
Published
2024-10-31
DOI
https://doi.org/10.15294/jtsp.v26i2.9013
Primary Topic
Mining Techniques and Economics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Rainfall Duration’s Impact on Mining Earthmoving Equipment Performance – Case Study at PT. BUMA GEO-AJE, South Kalimantan

Nurcan Başar, Hartono Hartono, Siti Muawanah Robial
Jurnal Teknik Sipil dan Perencanaan
Mining Techniques and Economics
article

Rainfall Duration’s Impact on Mining Earthmoving Equipment Performance – Case Study at PT. BUMA GEO-AJE, South Kalimantan

Nurcan Başar, Hartono Hartono, Siti Muawanah Robial
article en

Abstract

This study investigates the impact of rainfall duration on the performance of earthmoving equipment at PT BUMA, GEO-AJE, South Kalimantan. Data from April 2023 covering 29 days were analyzed using SPSS 22 and Origin 2024. The study revealed a 7.06637% decrease in excavator and dump truck efficiency per hour of rainfall. Cycle times were increased by 0.15122 minutes for excavators and 4.50034 minutes for dump trucks per hour of rain. Moreover, excavator productivity declined by 1138.82900 bcm/day and dump truck productivity by 176.21836 bcm/day. These results highlight the necessity of accounting for rainfall in mining operations, especially in productivity forecasts and equipment management.

Jurnal Teknik Sipil dan PerencanaanVol. 26(2)
Universitas Muhammadiyah Jember (ID), Universitas Muhammadiyah Sukabumi (ID)
Openalex Percentile: Top 78%
Mining Techniques and Economics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.