Metal Culvert Renewal Prioritization Framework Using Fuzzy Inference System

Saskatchewan boasts an extensive road network, spanning over 250,000 km and featuring more than 26,500 culverts that facilitate the flow of water. Ensuring the timely replacement of these culverts is of paramount importance to prevent potential disasters and safeguard water quality. This research focuses on the prioritization of infrastructure renewal, with a particular emphasis on metal culverts. This study undertakes a rigorous evaluation of two statistical and computational methods—ordinal logistic regression and a fuzzy inference system—through an exhaustive examination of 1000 metal culverts situated along Saskatchewan’s highway network. Performance evaluation metrics, including area under the curve, percentage of correct predictions, confusion matrix analysis, accuracy, precision, recall, and the F1 score, consistently highlight the fuzzy inference system method as the superior and most efficacious approach for prioritizing culvert renewal within this crucial infrastructure context.

Authors

Institutions

Publication Details

Published
2024-10-25
DOI
https://doi.org/10.3390/engproc2024076046
Primary Topic
Geotechnical Engineering and Underground Structures
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Metal Culvert Renewal Prioritization Framework Using Fuzzy Inference System

Niamat Ullah Ibne Hossain, Golam Kabir, Pooneh Marzbani
Geotechnical Engineering and Underground Structures
article

Metal Culvert Renewal Prioritization Framework Using Fuzzy Inference System

Niamat Ullah Ibne Hossain, Golam Kabir, Pooneh Marzbani
article en

Abstract

Saskatchewan boasts an extensive road network, spanning over 250,000 km and featuring more than 26,500 culverts that facilitate the flow of water. Ensuring the timely replacement of these culverts is of paramount importance to prevent potential disasters and safeguard water quality. This research focuses on the prioritization of infrastructure renewal, with a particular emphasis on metal culverts. This study undertakes a rigorous evaluation of two statistical and computational methods—ordinal logistic regression and a fuzzy inference system—through an exhaustive examination of 1000 metal culverts situated along Saskatchewan’s highway network. Performance evaluation metrics, including area under the curve, percentage of correct predictions, confusion matrix analysis, accuracy, precision, recall, and the F1 score, consistently highlight the fuzzy inference system method as the superior and most efficacious approach for prioritizing culvert renewal within this crucial infrastructure context.

Arkansas State University (US), University of Regina (CA)
Openalex Percentile: Top 78%
Geotechnical Engineering and Underground Structures
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Metal Culvert Renewal Prioritization Framework Using Fuzzy Inference System — Niamat Ullah Ibne Hossain, Golam Kabir, et al. · (2024) | TGRS Research Map | TGRS