Measures to Shorten the Operation Time of Replacing the First Insulator

The insulator string of the transmission line is connected by multiple single-chip insulators. A defect in an insulator must be replaced in time to avoid the single-phase grounding fault caused by insufficient creepage distance. The insulator near the wire side is usually called the first insulator. At present, it takes a long time for the State Grid Corporation to replace the first insulator. In this paper, through investigation and research, it is determined that the slight rotation angle of the bowl head and the small rotation angle of the rocker are the main reasons for the long time of dismantling and assembling the insulator, which in turn causes the time of replacing the first insulator. The double fulcrum clamp and extension plate were made for the main reasons and applied to the site, which successfully shortened the operation time of replacing the first insulator. The research results of this paper effectively shorten the operation time of replacing the first insulator, avoid the overtime fatigue operation of operators, ensure personal safety, improve work efficiency, and have good application value.

Authors

Institutions

Publication Details

Published
2024-08-29
DOI
https://doi.org/10.1109/icsece61636.2024.10729315
Primary Topic
Aerogels and thermal insulation
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Measures to Shorten the Operation Time of Replacing the First Insulator

Chuanzong Zhao, Chenghao Lan, Xiang Yu, Tianhe Liu et al.
Aerogels and thermal insulation
article

Measures to Shorten the Operation Time of Replacing the First Insulator

Chuanzong Zhao, Chenghao Lan, Xiang Yu, Tianhe Liu, Yuxiang Ai, Xinyu Yang
article en

Abstract

The insulator string of the transmission line is connected by multiple single-chip insulators. A defect in an insulator must be replaced in time to avoid the single-phase grounding fault caused by insufficient creepage distance. The insulator near the wire side is usually called the first insulator. At present, it takes a long time for the State Grid Corporation to replace the first insulator. In this paper, through investigation and research, it is determined that the slight rotation angle of the bowl head and the small rotation angle of the rocker are the main reasons for the long time of dismantling and assembling the insulator, which in turn causes the time of replacing the first insulator. The double fulcrum clamp and extension plate were made for the main reasons and applied to the site, which successfully shortened the operation time of replacing the first insulator. The research results of this paper effectively shorten the operation time of replacing the first insulator, avoid the overtime fatigue operation of operators, ensure personal safety, improve work efficiency, and have good application value.

Liaoning Shihua University (CN)
Affordable and clean energy
Openalex Percentile: Top 85%
Aerogels and thermal insulation
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.