A Measure for Shortening Partial Discharge Test Time of Transformer

As an important part of transforming voltage level, transformer plays an important role in ensuring the stability of power grid. The partial discharge test of transformer is an ideal insulation test project, which is being popularized and applied. All the transformers that can pass the partial discharge test have high reliability in operation. However, the traditional partial discharge test time is too long, mostly more than 40 minutes, so it is necessary to shorten the transformer partial discharge test time and improve the efficiency. In this paper, by combing the partial discharge test process and analyzing the connection steps in depth, the intelligent partial discharge test support device and special clamp are developed. After many applications in the field, the partial discharge test time is obviously shortened, so as to avoid the danger caused by personnel repeated wiring, and greatly improve the work efficiency of electrical testers.

Authors

Institutions

Publication Details

Published
2024-08-29
DOI
https://doi.org/10.1109/icsece61636.2024.10729544
Citations
1
Primary Topic
High voltage insulation and dielectric phenomena
Type
article
Field-Weighted Citation Impact
0.12
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Measure for Shortening Partial Discharge Test Time of Transformer

Haotian Xia, Yue Wang, Yutao Liu, Yilin Li et al.
1 citations
High voltage insulation and dielectric phenomena
0.12
article

A Measure for Shortening Partial Discharge Test Time of Transformer

Haotian Xia, Yue Wang, Yutao Liu, Yilin Li, Zekai Gu, Jing Liu
article en
1 citations

Abstract

As an important part of transforming voltage level, transformer plays an important role in ensuring the stability of power grid. The partial discharge test of transformer is an ideal insulation test project, which is being popularized and applied. All the transformers that can pass the partial discharge test have high reliability in operation. However, the traditional partial discharge test time is too long, mostly more than 40 minutes, so it is necessary to shorten the transformer partial discharge test time and improve the efficiency. In this paper, by combing the partial discharge test process and analyzing the connection steps in depth, the intelligent partial discharge test support device and special clamp are developed. After many applications in the field, the partial discharge test time is obviously shortened, so as to avoid the danger caused by personnel repeated wiring, and greatly improve the work efficiency of electrical testers.

Shanghai Electric (China) (CN)
Openalex Percentile: Top 59%
High voltage insulation and dielectric phenomena
0.12
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.