Engineering Value in Projects Building Construction: Case Research Sofifi 3-Story ASN Official House - North Maluku Province

The sustainability of construction projects often hinges on managing costs effectively, as illustrated by the case study of an ASN housing building project in Sofifi, North Maluku. This research aims to achieve significant cost savings by optimizing the selection of construction materials and methods, utilizing the Value Engineering Method. This method systematically assesses the value of each component relative to its function, promoting an innovative approach to minimizing unnecessary expenditures. The research followed several structured stages: information gathering, creative ideation, analysis, evaluation, and development, each focusing on identifying feasible alternatives to reduce costs. The analysis identified two key solutions: replacing conventional flooring with precast materials for floor work and substituting lightweight brick walls with red brick walls. Implementing these changes reduced the total project cost from IDR 2,295,005,206 to IDR 1,698,939,324, achieving savings of IDR 596,115,883 (35%). The findings of this study provide practical implications for construction project management, offering a structured approach to material and method selection that can be adapted to broader-scale projects for enhanced cost-efficiency.

Authors

Institutions

Publication Details

Journal
Asian Journal of Engineering Social and Health
Published
2024-10-26
DOI
https://doi.org/10.46799/ajesh.v3i10.427
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Engineering Value in Projects Building Construction: Case Research Sofifi 3-Story ASN Official House - North Maluku Province

Fitri Budi Suryani, Ibnu Kubais, Arman Jayadi
Asian Journal of Engineering Social and Health
Management and Optimization Techniques
article

Engineering Value in Projects Building Construction: Case Research Sofifi 3-Story ASN Official House - North Maluku Province

Fitri Budi Suryani, Ibnu Kubais, Arman Jayadi
article en

Abstract

The sustainability of construction projects often hinges on managing costs effectively, as illustrated by the case study of an ASN housing building project in Sofifi, North Maluku. This research aims to achieve significant cost savings by optimizing the selection of construction materials and methods, utilizing the Value Engineering Method. This method systematically assesses the value of each component relative to its function, promoting an innovative approach to minimizing unnecessary expenditures. The research followed several structured stages: information gathering, creative ideation, analysis, evaluation, and development, each focusing on identifying feasible alternatives to reduce costs. The analysis identified two key solutions: replacing conventional flooring with precast materials for floor work and substituting lightweight brick walls with red brick walls. Implementing these changes reduced the total project cost from IDR 2,295,005,206 to IDR 1,698,939,324, achieving savings of IDR 596,115,883 (35%). The findings of this study provide practical implications for construction project management, offering a structured approach to material and method selection that can be adapted to broader-scale projects for enhanced cost-efficiency.

Asian Journal of Engineering Social and HealthVol. 3(10)
Universitas Persada Indonesia Yayasan Administrasi Indonesia (ID)
Industry, innovation and infrastructure
Openalex Percentile: Top 67%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.