Improving automotive tire defect in the vulcanization process by leakage bladders issues

The primary objective of this project is to minimize defects in industrial tires resulting from issues with leaking bladders during the curing process. The project aims to reduce the current monthly defective tire production of 1,378.70 kilograms to a target of 1,240.83 kilograms per month, which represents a 10% reduction in defects. Utilizing the QC story methodology, QC 7-tools, and Quality Control techniques, a thorough examination of data and root cause analysis identified five significant factors contributing to defective tires caused by bladder leakage. These factors include 1) a lack of expertise in bladder inspection, 2) excessive usage of bladders, 3) contaminations on the bladder surface, 4) inadequate bladder lubrication and 5) oxidation occurring inside the bladder. To address these issues, a new operational procedure and training program were introduced, alongside modifications to the curing machine to mitigate the oxidation process. Over a span of two months, these changes resulted in a reduction in defective tires to 735.345 kilograms per month, equivalent to a 46.66% decrease in the problem, and a cost savings of 10,000 USD per year.

Authors

Institutions

Publication Details

Published
2024-10-28
DOI
https://doi.org/10.1117/12.3050600
Primary Topic
Risk and Safety Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Improving automotive tire defect in the vulcanization process by leakage bladders issues

Kittiwat Sirikasemsuk, tossapol kiatcharonepol, Penpisut Sawangnimitkul, Rattanaporn Rattanaporn
Risk and Safety Analysis
article

Improving automotive tire defect in the vulcanization process by leakage bladders issues

Kittiwat Sirikasemsuk, tossapol kiatcharonepol, Penpisut Sawangnimitkul, Rattanaporn Rattanaporn
article en

Abstract

The primary objective of this project is to minimize defects in industrial tires resulting from issues with leaking bladders during the curing process. The project aims to reduce the current monthly defective tire production of 1,378.70 kilograms to a target of 1,240.83 kilograms per month, which represents a 10% reduction in defects. Utilizing the QC story methodology, QC 7-tools, and Quality Control techniques, a thorough examination of data and root cause analysis identified five significant factors contributing to defective tires caused by bladder leakage. These factors include 1) a lack of expertise in bladder inspection, 2) excessive usage of bladders, 3) contaminations on the bladder surface, 4) inadequate bladder lubrication and 5) oxidation occurring inside the bladder. To address these issues, a new operational procedure and training program were introduced, alongside modifications to the curing machine to mitigate the oxidation process. Over a span of two months, these changes resulted in a reduction in defective tires to 735.345 kilograms per month, equivalent to a 46.66% decrease in the problem, and a cost savings of 10,000 USD per year.

King Mongkut's Institute of Technology Ladkrabang (TH)
Affordable and clean energy
Openalex Percentile: Top 81%
Risk and Safety Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.