Impact of compliance with project requirements on projects value outcomes: Evaluation from TASAF-III beneficiaries’ perspectives in Tanzania

The study sought to evaluate the impact of compliance with projects requirements on projects value outcomes from Tanzania Social Action Fund (TASAF)-III beneficiaries’ perspectives in Tanzania. Specifically, the study evaluated the impact of compliance with project requirements on households’ relief from transitional income poverty (as a measure of projects value outcomes) in Tanzania. The study was a cross sectional design with multiple cases approach undertaken in twelve TASAF-III supported community economic development (CED) projects. Under multistage sampling procedure, the said CED projects, their six hosting districts and regions (Kilosa–Morogoro; Handeni–Tanga; Misungwi–Mwanza; Uyui–Tabora; Kibondo–Kigoma; and, Rungwe–Mbeya) were identified using stratified sampling. Simple random sampling enhanced to determine a sample of 480 households. Data were collected using research schedules and were descriptively and inferentially analyzed using STATA software. Propensity score matching (PSM), coupled with logistic model was considered the apt test statistic. The average treatment effect on the treated (ATT) observation results shown that, the mean differences in incomes [TZS. 7 794.30; t=0.61(t<2.00)] and spending [TZS 11 388.50; t=0.96 (t<2.00)] between the treated and control households’ are non-significant at t<2.00. This implied that, compliance with TASAF-III project requirements has no significant impact on households’ income poverty relief in Tanzania. Moreover, compliance with requirements does not necessarily lead to desired projects value outcomes—if requirements are not well defined. The study stresses on the selection of right projects’ requirements with positive outcomes rather than having a set of requirements which are non-predictive to the desired targets’ felt needs—when in compliance with.

Authors

Institutions

Publication Details

Journal
The Accountancy and Business Review
Published
2024-10-27
DOI
https://doi.org/10.59645/abr.v16i4.385
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Impact of compliance with project requirements on projects value outcomes: Evaluation from TASAF-III beneficiaries’ perspectives in Tanzania

Godfrey Magorombe Matiku Maswe, Benedicto Kazuzuru, Emmanuel Timothy Malisa
1 links
The Accountancy and Business Review
Construction Project Management and Performance
article

Impact of compliance with project requirements on projects value outcomes: Evaluation from TASAF-III beneficiaries’ perspectives in Tanzania

Godfrey Magorombe Matiku Maswe, Benedicto Kazuzuru, Emmanuel Timothy Malisa
article en

Abstract

The study sought to evaluate the impact of compliance with projects requirements on projects value outcomes from Tanzania Social Action Fund (TASAF)-III beneficiaries’ perspectives in Tanzania. Specifically, the study evaluated the impact of compliance with project requirements on households’ relief from transitional income poverty (as a measure of projects value outcomes) in Tanzania. The study was a cross sectional design with multiple cases approach undertaken in twelve TASAF-III supported community economic development (CED) projects. Under multistage sampling procedure, the said CED projects, their six hosting districts and regions (Kilosa–Morogoro; Handeni–Tanga; Misungwi–Mwanza; Uyui–Tabora; Kibondo–Kigoma; and, Rungwe–Mbeya) were identified using stratified sampling. Simple random sampling enhanced to determine a sample of 480 households. Data were collected using research schedules and were descriptively and inferentially analyzed using STATA software. Propensity score matching (PSM), coupled with logistic model was considered the apt test statistic. The average treatment effect on the treated (ATT) observation results shown that, the mean differences in incomes [TZS. 7 794.30; t=0.61(t<2.00)] and spending [TZS 11 388.50; t=0.96 (t<2.00)] between the treated and control households’ are non-significant at t<2.00. This implied that, compliance with TASAF-III project requirements has no significant impact on households’ income poverty relief in Tanzania. Moreover, compliance with requirements does not necessarily lead to desired projects value outcomes—if requirements are not well defined. The study stresses on the selection of right projects’ requirements with positive outcomes rather than having a set of requirements which are non-predictive to the desired targets’ felt needs—when in compliance with.

The Accountancy and Business ReviewVol. 16(4)
Institute of Accountancy Arusha (TZ), Sokoine University of Agriculture (TZ)
No poverty
Openalex Percentile: Top 77%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.