Estimate and Extend the Time between Overhauls for the Railcar Body

This paper addresses the challenge of estimating and extending the time between overhauls of railcar bodies, which are crucial components in rail freight transportation. Railcar bodies endure significant operational loads, leading to damage and the need for frequent repairs. In response to this issue, a novel approach has been proposed: the use of an operational factor of safety that considers both the probability of failure-free operation and the likelihood of load occurrence on the railcar body. A new equation has been introduced to determine the time between overhauls of these bodies. The focus of this paper is on the development of innovative engineering solutions aimed at enhancing the strength and reliability of railcar bodies. Theoretical and experimental studies were conducted to validate the effectiveness of the proposed design. The results demonstrate that the implementation of these solutions can extend the time between overhauls of the railcar body by 1.21 to 2.06 times, depending on operating conditions.

Authors

Publication Details

Journal
Eksploatacja i Niezawodnosc - Maintenance and Reliability
Published
2024-10-26
DOI
https://doi.org/10.17531/ein/195021
Citations
2
Primary Topic
Railway Engineering and Dynamics
Type
article
Field-Weighted Citation Impact
0.43
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Estimate and Extend the Time between Overhauls for the Railcar Body

Maryna Bulakh
2 citations
Eksploatacja i Niezawodnosc - Maintenance and Reliability
Railway Engineering and Dynamics
0.43
article

Estimate and Extend the Time between Overhauls for the Railcar Body

Maryna Bulakh
article en
2 citations

Abstract

This paper addresses the challenge of estimating and extending the time between overhauls of railcar bodies, which are crucial components in rail freight transportation. Railcar bodies endure significant operational loads, leading to damage and the need for frequent repairs. In response to this issue, a novel approach has been proposed: the use of an operational factor of safety that considers both the probability of failure-free operation and the likelihood of load occurrence on the railcar body. A new equation has been introduced to determine the time between overhauls of these bodies. The focus of this paper is on the development of innovative engineering solutions aimed at enhancing the strength and reliability of railcar bodies. Theoretical and experimental studies were conducted to validate the effectiveness of the proposed design. The results demonstrate that the implementation of these solutions can extend the time between overhauls of the railcar body by 1.21 to 2.06 times, depending on operating conditions.

Eksploatacja i Niezawodnosc - Maintenance and ReliabilityVol. 27(2)
Industry, innovation and infrastructure
Openalex Percentile: Top 41%
Railway Engineering and Dynamics
0.43
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.