An Analytical Review for Search of Optimal Selection & Utilization of Earthwork Equipment in Construction

Different types of equipment with various levels/times application times are the characteristic features of all construction projects. Almost every construction project/industry has the most common problem of slow progress and cost overruns due to increasing downtime and decreasing operational efficiency of construction equipment. Construction equipment is involved in construction to such an extent that without it no construction activity can be performed. In recent years, with the continuous advancement in technology and improvement of urbanization, there have been more and more construction project/equipment requirements resulting in either the project delay or cost enhancement As the most critical element earthwork is responsible for not only successful completion of project within schedule but also for the starting of the project, selection of right equipment for earthwork is necessary. Earthwork complexity further increases due to various soil types and equipment, and adverse environmental conditions The present study is concentrated or focused on soil and various costs based practices adopted for the selection of construction equipment and an attempt has been made to find the optimal solution for the most problematic or responsible activities for the delay in project/cost overrun especially in context to excavation, compression, and earth / material movement equipment utilization.

Authors

Publication Details

Journal
International Journal of Emerging Science and Engineering
Published
2024-10-26
DOI
https://doi.org/10.35940/ijese.k2587.12111024
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An Analytical Review for Search of Optimal Selection & Utilization of Earthwork Equipment in Construction

Brajesh Mishra, Ajai Kumar
International Journal of Emerging Science and Engineering
BIM and Construction Integration
article

An Analytical Review for Search of Optimal Selection & Utilization of Earthwork Equipment in Construction

Brajesh Mishra, Ajai Kumar
article en

Abstract

Different types of equipment with various levels/times application times are the characteristic features of all construction projects. Almost every construction project/industry has the most common problem of slow progress and cost overruns due to increasing downtime and decreasing operational efficiency of construction equipment. Construction equipment is involved in construction to such an extent that without it no construction activity can be performed. In recent years, with the continuous advancement in technology and improvement of urbanization, there have been more and more construction project/equipment requirements resulting in either the project delay or cost enhancement As the most critical element earthwork is responsible for not only successful completion of project within schedule but also for the starting of the project, selection of right equipment for earthwork is necessary. Earthwork complexity further increases due to various soil types and equipment, and adverse environmental conditions The present study is concentrated or focused on soil and various costs based practices adopted for the selection of construction equipment and an attempt has been made to find the optimal solution for the most problematic or responsible activities for the delay in project/cost overrun especially in context to excavation, compression, and earth / material movement equipment utilization.

International Journal of Emerging Science and EngineeringVol. 12(11)
Openalex Percentile: Top 80%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

An Analytical Review for Search of Optimal Selection & Utilization of Earthwork Equipment in Construction — Brajesh Mishra, Ajai Kumar · International Journal of Emerging Science and Engineering (2024) | TGRS Research Map | TGRS