Study on Operation Disturbance Characteristics of Three-phase Common Box GIS Switch and Its Influence on Secondary Cable

With the development of intelligent substations, the problems of very fast transient overvoltage (VFTO) and transient enclosure voltage (TEV) caused by gas insulated substation (GIS) disconnector operation become more prominent, which may not only cause harm to the insulation system of primary equipment, but also couple electromagnetic disturbance to secondary equipment. In this paper, TEV due to disconnector and circuit breaker operation were tested in a three-phase common box GIS substation. The VFTO and TEV co-simulation model is established in EMTP-ATP software. The VFTO and TEV waveform and spectrum are calculated and analyzed. Different arc models are used to simulate. The amplitude and frequency of VFTO and TEV waveform under different arc models are obtained. In this paper, KVVP2-22 cable commonly used in substations is selected to simulate the disturbance voltage of the secondary cable coupled by VFTO.

Authors

Institutions

Publication Details

Published
2024-09-02
DOI
https://doi.org/10.1109/emceurope59828.2024.10722352
Primary Topic
Power Systems and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Study on Operation Disturbance Characteristics of Three-phase Common Box GIS Switch and Its Influence on Secondary Cable

Dingding Yao, Guang-Xiao Luo, Weidong Zhang, Guoqing Zhang et al.
Power Systems and Technologies
article

Study on Operation Disturbance Characteristics of Three-phase Common Box GIS Switch and Its Influence on Secondary Cable

Dingding Yao, Guang-Xiao Luo, Weidong Zhang, Guoqing Zhang, Hongjun Min, Fanzhong Mu, Guanglong Zhou
article en

Abstract

With the development of intelligent substations, the problems of very fast transient overvoltage (VFTO) and transient enclosure voltage (TEV) caused by gas insulated substation (GIS) disconnector operation become more prominent, which may not only cause harm to the insulation system of primary equipment, but also couple electromagnetic disturbance to secondary equipment. In this paper, TEV due to disconnector and circuit breaker operation were tested in a three-phase common box GIS substation. The VFTO and TEV co-simulation model is established in EMTP-ATP software. The VFTO and TEV waveform and spectrum are calculated and analyzed. Different arc models are used to simulate. The amplitude and frequency of VFTO and TEV waveform under different arc models are obtained. In this paper, KVVP2-22 cable commonly used in substations is selected to simulate the disturbance voltage of the secondary cable coupled by VFTO.

North China Electric Power University (CN)
Openalex Percentile: Top 83%
Power Systems and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.