Aggregated regulation and coordinated scheduling of PV-storage integrated 5G base stations considering PV-load uncertainty

Photovoltaic (PV)-storage integrated 5G base station (BS) can participate in demand response on a large scale, conduct electricity transaction and provide auxiliary services, thus reducing the high electricity consumption of 5G BSs and increasing the flexibility resource capacity of the distribution network. However, the flexible resource regulation of PV-storage integrated 5G BSs still faces problems such as many regulators, ignored PV-load uncertainty, and poor adaptability of existing regulatory frameworks and scheduling methods, which leads to greater security operation risks in resource regulation decisions and affects the exploitation of the 5G BSs scheduling potential. Aiming at the above problems, this paper proposes an aggregated regulation and coordinated scheduling method of PV-storage integrated 5G BSs considering PV-load uncertainty. Firstly, a hierarchical cluster-cooperative aggregated regulation framework for the scale PV-storage integrated 5G BSs is established, and a regional communication operator (RCO) schedulable capability model and an information gap decision theory (IGDT) based PV-load uncertainty model are built. Next, a two-stage joint optimization problem is proposed for maximizing the RCO income while reducing the BS cluster operation cost. Then, the first-stage day-ahead transaction optimization problem in the electricity market is solved, and the reliable operation planning and economic operation planning strategies are proposed based on IGDT to adapt to the regulation demand under different uncertainty risks; the second-stage BS cluster real-time operation optimization problem is solved based on the adaptive consensus algorithm considering scheduling preferences (ACSP), achieving distributed real-time coordinated scheduling of multiple agents in the BS cluster. Finally, the effectiveness of the proposed method is verified by simulation examples, which show that the aggregated regulation and coordinated scheduling of PV-storage integrated 5G BSs can achieve mutual benefits for the distribution network and communication operators.

Authors

Publication Details

Journal
International Journal of Electrical Power & Energy Systems
Published
2024-10-25
DOI
https://doi.org/10.1016/j.ijepes.2024.110306
Citations
6
Primary Topic
Smart Grid Energy Management
Type
article
Field-Weighted Citation Impact
1.25

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Aggregated regulation and coordinated scheduling of PV-storage integrated 5G base stations considering PV-load uncertainty

Zhongwei Sun, Zhenyu Zhou, Xi Liu, Tian Ding et al.
6 citations
International Journal of Electrical Power & Energy Systems
Smart Grid Energy Management
1.25
article

Aggregated regulation and coordinated scheduling of PV-storage integrated 5G base stations considering PV-load uncertainty

Zhongwei Sun, Zhenyu Zhou, Xi Liu, Tian Ding, C. Q. Li, Jiayi Liu
article en
6 citations

Abstract

Photovoltaic (PV)-storage integrated 5G base station (BS) can participate in demand response on a large scale, conduct electricity transaction and provide auxiliary services, thus reducing the high electricity consumption of 5G BSs and increasing the flexibility resource capacity of the distribution network. However, the flexible resource regulation of PV-storage integrated 5G BSs still faces problems such as many regulators, ignored PV-load uncertainty, and poor adaptability of existing regulatory frameworks and scheduling methods, which leads to greater security operation risks in resource regulation decisions and affects the exploitation of the 5G BSs scheduling potential. Aiming at the above problems, this paper proposes an aggregated regulation and coordinated scheduling method of PV-storage integrated 5G BSs considering PV-load uncertainty. Firstly, a hierarchical cluster-cooperative aggregated regulation framework for the scale PV-storage integrated 5G BSs is established, and a regional communication operator (RCO) schedulable capability model and an information gap decision theory (IGDT) based PV-load uncertainty model are built. Next, a two-stage joint optimization problem is proposed for maximizing the RCO income while reducing the BS cluster operation cost. Then, the first-stage day-ahead transaction optimization problem in the electricity market is solved, and the reliable operation planning and economic operation planning strategies are proposed based on IGDT to adapt to the regulation demand under different uncertainty risks; the second-stage BS cluster real-time operation optimization problem is solved based on the adaptive consensus algorithm considering scheduling preferences (ACSP), achieving distributed real-time coordinated scheduling of multiple agents in the BS cluster. Finally, the effectiveness of the proposed method is verified by simulation examples, which show that the aggregated regulation and coordinated scheduling of PV-storage integrated 5G BSs can achieve mutual benefits for the distribution network and communication operators.

International Journal of Electrical Power & Energy SystemsVol. 162
China Southern Power Grid
Openalex Percentile: Top 20%
Smart Grid Energy Management
1.25
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.