Replacement Scheme and Insulation Performance Analysis of Bushing on Network Dide of 800kV Converter Transformer

Converter transformer is the key equipment in DC project, and the network-side bushing is the most critical component. In recent years, there have been many serious incidents in China, such as porcelain bushing bursting and transformer burning, which are called “firecrackers on the oil tank”. In order to eliminate the potential safety hazard of the oil-filled bushing, it is decided to replace the oil-filled bushing on the side of the rheological network. In this paper, based on the scheme of replacing the 500kV oil-filled bushing of converter transformer at ±800kV UHV Tianshan Converter Station with epoxy resin impregnated paper bushing (dry bushing) with high structural strength and good anti-explosion and flame resistance, the selection principle of electrical performance parameters and installation size of the bushing are analyzed. The axisymmetric finite element model of casing is established by finite element software, and the electric field of casing is simulated. The process steps of casing replacement are described in detail. This paper can be used as a guide for the replacement of similar casing.

Authors

Institutions

Publication Details

Published
2024-08-08
DOI
https://doi.org/10.1109/hvdc62448.2024.10722938
Primary Topic
High voltage insulation and dielectric phenomena
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Replacement Scheme and Insulation Performance Analysis of Bushing on Network Dide of 800kV Converter Transformer

Fei Zhang, Wei‐Ning Zhang, Ge Zhijie, Lei Liu et al.
High voltage insulation and dielectric phenomena
article

Replacement Scheme and Insulation Performance Analysis of Bushing on Network Dide of 800kV Converter Transformer

Fei Zhang, Wei‐Ning Zhang, Ge Zhijie, Lei Liu, Longfei Li, Xuefeng Han, Wang Minkai
article en

Abstract

Converter transformer is the key equipment in DC project, and the network-side bushing is the most critical component. In recent years, there have been many serious incidents in China, such as porcelain bushing bursting and transformer burning, which are called “firecrackers on the oil tank”. In order to eliminate the potential safety hazard of the oil-filled bushing, it is decided to replace the oil-filled bushing on the side of the rheological network. In this paper, based on the scheme of replacing the 500kV oil-filled bushing of converter transformer at ±800kV UHV Tianshan Converter Station with epoxy resin impregnated paper bushing (dry bushing) with high structural strength and good anti-explosion and flame resistance, the selection principle of electrical performance parameters and installation size of the bushing are analyzed. The axisymmetric finite element model of casing is established by finite element software, and the electric field of casing is simulated. The process steps of casing replacement are described in detail. This paper can be used as a guide for the replacement of similar casing.

Inner Mongolia Electric Power (China) (CN)
Affordable and clean energy
Openalex Percentile: Top 88%
High voltage insulation and dielectric phenomena
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.