Early and post-stage piping erosion in bentonite buffer materials exposed to groundwater inflow

Piping erosion presents a significant concern in engineered barrier system (EBS), contributing to performance uncertainties. However, the early-stage hydration and piping erosion characteristics of calcium-type bentonite under concentrated water inflow conditions are not fully understood. To address this gap, we examined early- and post-stage piping erosion in bentonite buffer materials. Specifically, we focused on the onset and evolution of piping channels with changes in the inflow pressure and their impact on buffer material integrity. Piping experiments were conducted using bentonite in block, granule, and powder forms under constant flow rate conditions. We analyzed the hydraulic-mechanical responses at the bentonite-cell interface, fluctuations in inflow water pressure, and eroded soil mass. Additionally, X-ray computed tomography imaging was utilized to assess the deterioration of buffer materials after piping. The results revealed that early-stage hydration-induced erosion behaviors are contingent upon the state of the bentonite buffer, with compacted blocks exhibiting predominant piping erosion. The rapid pressure buildup and breakthrough is essential in triggering piping erosion in the blocks, while the evolution of piping channels is influenced by the flow rate. Furthermore, severe cracks occurred along with the piping channels under reduced flow rate conditions, creating voids in the buffer amounting to 1.5–3.1 % of its initial volume. These findings provide insights into buffer-rock interfacial interactions in EBS, serving as the basis for in situ disposal experiments and the safe design of disposal repositories. ● Early-stage hydration and piping phenomena in bentonite buffers were investigated. ● Piping tests using powder, granules, and compacted blocks were conducted. ● Rapid pressure buildup and breakthrough are critical in piping erosion dynamics. ● X-ray CT is used for post-piping crack quantification in compacted bentonite block. ● Technical concerns for post-piping deterioration in buffer materials were discussed.

Authors

Institutions

Publication Details

Journal
Geomechanics for Energy and the Environment
Published
2024-10-25
DOI
https://doi.org/10.1016/j.gete.2024.100611
Citations
4
Primary Topic
Dam Engineering and Safety
Type
article
Field-Weighted Citation Impact
1.04

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Early and post-stage piping erosion in bentonite buffer materials exposed to groundwater inflow

Jin-Seop Kim, Chang-Ho Hong, Minhyeong Lee, Jinwoo Kim et al.
4 citations
Geomechanics for Energy and the Environment
Dam Engineering and Safety
1.04
article

Early and post-stage piping erosion in bentonite buffer materials exposed to groundwater inflow

Jin-Seop Kim, Chang-Ho Hong, Minhyeong Lee, Jinwoo Kim, Ji-Won Kim
article en
4 citations

Abstract

Piping erosion presents a significant concern in engineered barrier system (EBS), contributing to performance uncertainties. However, the early-stage hydration and piping erosion characteristics of calcium-type bentonite under concentrated water inflow conditions are not fully understood. To address this gap, we examined early- and post-stage piping erosion in bentonite buffer materials. Specifically, we focused on the onset and evolution of piping channels with changes in the inflow pressure and their impact on buffer material integrity. Piping experiments were conducted using bentonite in block, granule, and powder forms under constant flow rate conditions. We analyzed the hydraulic-mechanical responses at the bentonite-cell interface, fluctuations in inflow water pressure, and eroded soil mass. Additionally, X-ray computed tomography imaging was utilized to assess the deterioration of buffer materials after piping. The results revealed that early-stage hydration-induced erosion behaviors are contingent upon the state of the bentonite buffer, with compacted blocks exhibiting predominant piping erosion. The rapid pressure buildup and breakthrough is essential in triggering piping erosion in the blocks, while the evolution of piping channels is influenced by the flow rate. Furthermore, severe cracks occurred along with the piping channels under reduced flow rate conditions, creating voids in the buffer amounting to 1.5–3.1 % of its initial volume. These findings provide insights into buffer-rock interfacial interactions in EBS, serving as the basis for in situ disposal experiments and the safe design of disposal repositories. ● Early-stage hydration and piping phenomena in bentonite buffers were investigated. ● Piping tests using powder, granules, and compacted blocks were conducted. ● Rapid pressure buildup and breakthrough are critical in piping erosion dynamics. ● X-ray CT is used for post-piping crack quantification in compacted bentonite block. ● Technical concerns for post-piping deterioration in buffer materials were discussed.

Geomechanics for Energy and the EnvironmentVol. 40
Korea Atomic Energy Research Institute (KR)
National Research Foundation of Korea
Openalex Percentile: Top 25%
Dam Engineering and Safety
1.04
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.