Planning Of A Household Scale Biodigester Unit For Biogas Recovery In Sekeloa District, Bandung City

Waste is one of the environmental problems in Bandung City. RT 05 RW 04 Sekeloa Village, Bandung City has a waste problem in its environment in the form of accumulation of waste caused by the difficulty of road access and the diverse topographical conditions of the area so that the transportation process does not run well. This research aims to plan biodigesters technology from organic waste so that it can minimize waste accumulation and provide benefits to local residents. This research was conducted by collecting observations, questionnaires, and analyzing the technical and non-technical aspects of waste management in RT 05 RW 04. From the analysis, it was found that the biodigester volume that can be used is 8.49 m3 with a diameter of 3 m, and a height of 1 m with a capacity to process organic waste of 113 kg / day. The designed biodigester is able to serve 178 people out of 222 people in RT 05 RW 04. With this biodigester technology, it is expected to reduce the use of LPG gas to 135 kg with a nominal value of Rp.2,970,000 every month

Authors

Institutions

Publication Details

Journal
Jurnal Pengendalian Pencemaran Lingkungan (JPPL)
Published
2024-09-30
DOI
https://doi.org/10.35970/jppl.v6i2.2337
Primary Topic
Anaerobic Digestion and Biogas Production
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Planning Of A Household Scale Biodigester Unit For Biogas Recovery In Sekeloa District, Bandung City

Muhammad Anshari, Mila Dirgawati, Riza Azrilla Sulaeman, Karennina Resaryana Eka Putri et al.
Jurnal Pengendalian Pencemaran Lingkungan (JPPL)
Anaerobic Digestion and Biogas Production
article

Planning Of A Household Scale Biodigester Unit For Biogas Recovery In Sekeloa District, Bandung City

Muhammad Anshari, Mila Dirgawati, Riza Azrilla Sulaeman, Karennina Resaryana Eka Putri, Sekar Arum Fajriyanti
article en

Abstract

Waste is one of the environmental problems in Bandung City. RT 05 RW 04 Sekeloa Village, Bandung City has a waste problem in its environment in the form of accumulation of waste caused by the difficulty of road access and the diverse topographical conditions of the area so that the transportation process does not run well. This research aims to plan biodigesters technology from organic waste so that it can minimize waste accumulation and provide benefits to local residents. This research was conducted by collecting observations, questionnaires, and analyzing the technical and non-technical aspects of waste management in RT 05 RW 04. From the analysis, it was found that the biodigester volume that can be used is 8.49 m3 with a diameter of 3 m, and a height of 1 m with a capacity to process organic waste of 113 kg / day. The designed biodigester is able to serve 178 people out of 222 people in RT 05 RW 04. With this biodigester technology, it is expected to reduce the use of LPG gas to 135 kg with a nominal value of Rp.2,970,000 every month

Jurnal Pengendalian Pencemaran Lingkungan (JPPL)Vol. 6(2)
Institut Teknologi Nasional Bandung (ID)
Openalex Percentile: Top 80%
Anaerobic Digestion and Biogas Production
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.