Effect of Monitoring and Evaluation Practices on Performance of Construction Projects in Gasabo District- Rwanda

Purpose: The purpose of this study was to assess the effect of monitoring and evaluation practices on performance of construction project in Gasabo district, Rwanda. The specific objectives of this study were to examine the effect of M&E planning, M&E Staff skills management and M&E ICT management on performance of construction projects in Gasabo district, Rwanda. Methodology: A descriptive research design was used. Two hundred sixty-three respondents randomly sampled from district, sectors and cells staff and the general local population who are involved in project planning of the construction projects at Gasabo district was interviewed. The data was collected using administered questionnaire and analyzed using SPSS 16. The study chosen to use qualitative and quantitative research methods to explore the topic and thus used multiple regression analysis such as ANOVA, Pearson correlation and descriptive analysis to estimate the strength relationship between the independent variables to the dependent variables. Findings: The result of the study showed that majority of the respondents were in agreement to the fact that the performance of construction project of Gasabo district was influenced by Monitoring and Evaluation practices. The findings indicate that M&E planning had a positive and significant effect on project performance with (β1=0.170, CI 0.010, 0.350, t=2.080, P<.001). Monitoring and Evaluation Staff skills management with β2=-.016, CI -.160, 0.131, t=-.196, P>.001), has no significant effect on project performance of construction project of Gasabo district. Finally, M&E ICT management performance had a positive and significant effect on construction project performance with (β3= 0.450, CI 0.393, 0.690, t=7.190, P<.001). Unique Contribution to Theory, Practice and Policy: The researcher recommends that monitoring and evaluation should be a priority in the projects for its relevancy; and all bodies dealing with construction projects should make arrangements for monitoring and evaluation practices due to make monitoring and evaluation operations successful.

Authors

Institutions

Publication Details

Journal
International Journal of Entrepreneurship and Project Management
Published
2024-10-23
DOI
https://doi.org/10.47604/ijepm.3024
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Effect of Monitoring and Evaluation Practices on Performance of Construction Projects in Gasabo District- Rwanda

Hoda Moussa, Malgit Akims
International Journal of Entrepreneurship and Project Management
Construction Project Management and Performance
article

Effect of Monitoring and Evaluation Practices on Performance of Construction Projects in Gasabo District- Rwanda

Hoda Moussa, Malgit Akims
article en

Abstract

Purpose: The purpose of this study was to assess the effect of monitoring and evaluation practices on performance of construction project in Gasabo district, Rwanda. The specific objectives of this study were to examine the effect of M&E planning, M&E Staff skills management and M&E ICT management on performance of construction projects in Gasabo district, Rwanda. Methodology: A descriptive research design was used. Two hundred sixty-three respondents randomly sampled from district, sectors and cells staff and the general local population who are involved in project planning of the construction projects at Gasabo district was interviewed. The data was collected using administered questionnaire and analyzed using SPSS 16. The study chosen to use qualitative and quantitative research methods to explore the topic and thus used multiple regression analysis such as ANOVA, Pearson correlation and descriptive analysis to estimate the strength relationship between the independent variables to the dependent variables. Findings: The result of the study showed that majority of the respondents were in agreement to the fact that the performance of construction project of Gasabo district was influenced by Monitoring and Evaluation practices. The findings indicate that M&E planning had a positive and significant effect on project performance with (β1=0.170, CI 0.010, 0.350, t=2.080, P<.001). Monitoring and Evaluation Staff skills management with β2=-.016, CI -.160, 0.131, t=-.196, P>.001), has no significant effect on project performance of construction project of Gasabo district. Finally, M&E ICT management performance had a positive and significant effect on construction project performance with (β3= 0.450, CI 0.393, 0.690, t=7.190, P<.001). Unique Contribution to Theory, Practice and Policy: The researcher recommends that monitoring and evaluation should be a priority in the projects for its relevancy; and all bodies dealing with construction projects should make arrangements for monitoring and evaluation practices due to make monitoring and evaluation operations successful.

International Journal of Entrepreneurship and Project ManagementVol. 9(3)
Mount Kenya University (KE), University of Kigali (RW), Mount Kigali University
Openalex Percentile: Top 77%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.