Intelligente Anlaufsteuerung für die Batteriezellenproduktion
Abstract The ramp-up of production lines as a result of changing product variants or production processes puts battery cell manufacturers under enormous quality and cost pressure due to high reject rates. A control system based on artificial intelligence methods can help to speed up the start-up processes. The InTeAn research project developed a procedure for developing a process control system to reduce ramp-up times and costs in battery cell production.
Authors
- Constanze Hasterok
- Sebastian Henschel (ORCID: https://orcid.org/0000-0003-1292-5548)
- Jürgen Fleischer (ORCID: https://orcid.org/0000-0003-0961-7675)
- Achim Kampker
- Matthieu Poyer
- Julius Pfrommer (ORCID: https://orcid.org/0000-0002-4204-6758)
- Alexej Gossmann (ORCID: https://orcid.org/0000-0001-9068-3877)
- Rui Yan Li
Institutions
- Fraunhofer Institute of Optronics, System Technologies and Image Exploitation (DE)
- RWTH Aachen University (DE)
Publication Details
- Journal
- Zeitschrift für wirtschaftlichen Fabrikbetrieb
- Published
- 2024-10-20
- DOI
- https://doi.org/10.1515/zwf-2024-1129
- Primary Topic
- Scheduling and Optimization Algorithms
- Type
- article
- Field-Weighted Citation Impact
- 0.00