Analysis of the Requirements for Electrical Networks During the Transformation of a Boiler House into a Mini-CHP
Due to the decrease in the efficiency of energy supply systems, which consists in increasing the cost of electricity, reducing accessibility and low reliability of power supply, the consumer is often forced to independently look for solutions to improve the efficiency of their power supply. At the same time, there is a tendency in Russia for total gasification of regions and affordable foreign and domestic low-power gas piston and gas turbine equipment. This has led to the growth of distributed energy and mini-CHP plants with a capacity of up to 25 MW. At the same time, one of the ways to create a mini-CHP is the reconstruction of gas heating boilers. This determines the tasks of analyzing the requirements for the power output schemes of such stations and identifying the requirements for the reconstruction of distribution electrical networks during the transformation of a boiler house into a mini-CHP.
Authors
- Sofya Kazakova
- Lyudmila Myshkina (ORCID: https://orcid.org/0000-0002-5121-4143)
Institutions
- Novosibirsk State Technical University (RU)
Publication Details
- Published
- 2024-09-27
- DOI
- https://doi.org/10.1109/uralcon62137.2024.10718992
- Citations
- 1
- Primary Topic
- Electric Power Systems and Control
- Type
- article
- Field-Weighted Citation Impact
- 0.21
Funders
- Russian Science Foundation