Abstract The modernizations, or retrofits of steam turbines, for combined cycle power plants represents a significant opportunity in the power industry due to the phase out of coal generation and the need for dispatchable power. Many steam turbines operating in combined cycle are reaching or surpassed the 200-thousand equivalent operating hours milestone, where a steam turbine modernization would be a viable option for consideration. A large segment of the combined cycle fleet is looking to modernize their equipment to increase efficiency, reliability, and life extension. These units are also focusing on operational flexibility to better meet their demand flexibility needs with more renewables coming on-line. This paper will outline several steam turbine modernization options available for combine cycle power plants and cite current industry challenges, such as lead-time and logistics impacts, that have made preplanning more important than ever.

Authors

Institutions

Publication Details

Published
2024-09-15
DOI
https://doi.org/10.1115/power2024-138887
Primary Topic
Advanced Power Generation Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Steam Turbine Modernization Options for Combined Cycle Power Plants-Addressing Industry Challenges

Michael Smiarowski
Advanced Power Generation Technologies
article

Steam Turbine Modernization Options for Combined Cycle Power Plants-Addressing Industry Challenges

Michael Smiarowski
article en

Abstract

Abstract The modernizations, or retrofits of steam turbines, for combined cycle power plants represents a significant opportunity in the power industry due to the phase out of coal generation and the need for dispatchable power. Many steam turbines operating in combined cycle are reaching or surpassed the 200-thousand equivalent operating hours milestone, where a steam turbine modernization would be a viable option for consideration. A large segment of the combined cycle fleet is looking to modernize their equipment to increase efficiency, reliability, and life extension. These units are also focusing on operational flexibility to better meet their demand flexibility needs with more renewables coming on-line. This paper will outline several steam turbine modernization options available for combine cycle power plants and cite current industry challenges, such as lead-time and logistics impacts, that have made preplanning more important than ever.

Siemens (United States) (US)
Openalex Percentile: Top 84%
Advanced Power Generation Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.