Design And Build Project Risk Analysis at Tugu Pal 0 Stage II Project Construction
The implementation of the design and build method in the Phase II Pal Nol Monument construction project, managed by the Public Works and Spatial Planning Agency (PUPR) of South Kalimantan Province, aims to analyze the risks associated with the design and construction processes. This project, which utilizes an integrated design and build construction method (multi-year), is located on Jl. Dharma Praja within the South Kalimantan Provincial Office Area and executed by the contractor KSO ADHI-PUTRA. A comprehensive risk mitigation strategy for the project includes detailed work planning, effective coordination, periodic evaluation, a thorough understanding of design specifications, continuous risk analysis, flexible contingency plans, and strong communication with government entities and stakeholders. Keywords: Risk Analysis, Design and Build, Construction, Tugu PAL 0 Stage II
Authors
- Aqli Mursadin (ORCID: https://orcid.org/0000-0002-9804-8429)
- Ryan Tirta Nugraha
Institutions
- Lambung Mangkurat University (ID)
Publication Details
- Journal
- International Journal of Research and Review
- Published
- 2024-10-19
- DOI
- https://doi.org/10.52403/ijrr.20241028
- Citations
- 1
- Primary Topic
- Quality and Safety in Healthcare
- Type
- article
- Field-Weighted Citation Impact
- 0.94