Application of Asphaltene Dispersant for Asphaltene Deposition Prevention in Esp Oil Producing Wells Seeing Plugging Issues

Abstract Some ESP oil producing wells located at BED-3 area had been suffered from deposits formation downstream the pump, which lead to repetitive failures due asphaltene deposition, increased downtime/workover need and loss of production due to the plugging accumulations in ESP stages and motor. This plugging was seen in low and high water cut wells despite the scale inhibitors were injecting efficiently at those wells. In this study, methods such as SARA method, and asphaltene screening are adopted for the study of ESP downhole organic plugging problem. In addition, field trials were conducted by injection the asphaltene dispersant chemical (X) through the control line downhole the sensor of the ESP to ensure the effectiveness of the selected asphaltene dispersant product based on the close monitoring of the relative electrical submersible pump parameters. Further monitoring extended to more than one year proved the best performance of the selected chemical.

Authors

Publication Details

Published
2024-10-20
DOI
https://doi.org/10.2118/223161-ms
Citations
1
Primary Topic
Petroleum Processing and Analysis
Type
article
Field-Weighted Citation Impact
0.24
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Application of Asphaltene Dispersant for Asphaltene Deposition Prevention in Esp Oil Producing Wells Seeing Plugging Issues

H. N. Mohamed, A.M.D. Khawlah Radi Azab, Mohamed Taha, M. S. Ismail
1 citations
Petroleum Processing and Analysis
0.24
article

Application of Asphaltene Dispersant for Asphaltene Deposition Prevention in Esp Oil Producing Wells Seeing Plugging Issues

H. N. Mohamed, A.M.D. Khawlah Radi Azab, Mohamed Taha, M. S. Ismail
article en
1 citations

Abstract

Abstract Some ESP oil producing wells located at BED-3 area had been suffered from deposits formation downstream the pump, which lead to repetitive failures due asphaltene deposition, increased downtime/workover need and loss of production due to the plugging accumulations in ESP stages and motor. This plugging was seen in low and high water cut wells despite the scale inhibitors were injecting efficiently at those wells. In this study, methods such as SARA method, and asphaltene screening are adopted for the study of ESP downhole organic plugging problem. In addition, field trials were conducted by injection the asphaltene dispersant chemical (X) through the control line downhole the sensor of the ESP to ensure the effectiveness of the selected asphaltene dispersant product based on the close monitoring of the relative electrical submersible pump parameters. Further monitoring extended to more than one year proved the best performance of the selected chemical.

Clean water and sanitation
Openalex Percentile: Top 50%
Petroleum Processing and Analysis
0.24
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Application of Asphaltene Dispersant for Asphaltene Deposition Prevention in Esp Oil Producing Wells Seeing Plugging Issues — H. N. Mohamed, A.M.D. Khawlah Radi Azab, et al. · (2024) | TGRS Research Map | TGRS