OS DESAFIOS DA IMPLANTAÇÃO DA METODOLOGIA BIM EM ESCRITÓRIOS DE ARQUITETURA NA CIDADE DE VITÓRIA DA CONQUISTA – BA

Building Information Modeling (BIM) can be defined as a methodology that uses 3D models and their detailed data on all elements involved in a civil construction project. As society is a constantly evolving organism, the Construction Industry has faced the need to adapt in order to deliver better productivity results, thereby meeting increasingly meticulous demands more effectively. Scientific research has shown that the use of BIM can reduce project completion times in infrastructure by up to half. Given this, why is the number of architecture and urban planning firms in Vitória da Conquista – BA, that use this methodology still so minimal? This article, through bibliographic research as well as opinion surveys with architects and urban planners from the city of Vitória da Conquista, aims to demonstrate the challenges of implementing Building Information Modeling (BIM) methodology in offices in Vitória da Conquista – BA. Thus, the points discussed in this work will provide a reflection on this question, the conclusion of which will depend on the awareness and experience of each participating architect, as well as the robustness of the understandings used to support the content in the following sections.

Authors

Publication Details

Journal
Revista fisio&terapia.
Published
2024-10-20
DOI
https://doi.org/10.69849/revistaft/ar10202410202304
Primary Topic
Education and Public Policy
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

OS DESAFIOS DA IMPLANTAÇÃO DA METODOLOGIA BIM EM ESCRITÓRIOS DE ARQUITETURA NA CIDADE DE VITÓRIA DA CONQUISTA – BA

Beatriz Sousa
Revista fisio&terapia.
Education and Public Policy
article

OS DESAFIOS DA IMPLANTAÇÃO DA METODOLOGIA BIM EM ESCRITÓRIOS DE ARQUITETURA NA CIDADE DE VITÓRIA DA CONQUISTA – BA

Beatriz Sousa
article en

Abstract

Building Information Modeling (BIM) can be defined as a methodology that uses 3D models and their detailed data on all elements involved in a civil construction project. As society is a constantly evolving organism, the Construction Industry has faced the need to adapt in order to deliver better productivity results, thereby meeting increasingly meticulous demands more effectively. Scientific research has shown that the use of BIM can reduce project completion times in infrastructure by up to half. Given this, why is the number of architecture and urban planning firms in Vitória da Conquista – BA, that use this methodology still so minimal? This article, through bibliographic research as well as opinion surveys with architects and urban planners from the city of Vitória da Conquista, aims to demonstrate the challenges of implementing Building Information Modeling (BIM) methodology in offices in Vitória da Conquista – BA. Thus, the points discussed in this work will provide a reflection on this question, the conclusion of which will depend on the awareness and experience of each participating architect, as well as the robustness of the understandings used to support the content in the following sections.

Revista fisio&terapia.Vol. 28(139)
Openalex Percentile: Top 71%
Education and Public Policy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

OS DESAFIOS DA IMPLANTAÇÃO DA METODOLOGIA BIM EM ESCRITÓRIOS DE ARQUITETURA NA CIDADE DE VITÓRIA DA CONQUISTA – BA — Beatriz Sousa · Revista fisio&terapia. (2024) | TGRS Research Map | TGRS