Study of solid waste generation and techno-economic analysis of pyrolysis of HDPE waste plastics in an academic institution in Nepal

The Institute of Engineering (IOE), Pulchowk Campus in Lalitpur, Nepal, faces serious solid waste mismanagement issues that threaten the environment and public health. In a comprehensive investigation from June 5 to 12 June 2022, IOE students sorted waste from 58 campus locations. They discovered that the average weights of plastic, paper, and organic waste were 5.84 kg, 8.85 kg, and 3.76 kg, respectively. The study identified current waste management risks and provided recycling strategies, emphasising the 3Rs (Reduce, Reuse, Recycle). Aspen Plus simulation indicated that 0.72 kg/day of segregated HDPE waste produced 0.65 kg/day of liquid fuel. The construction of a pyrolysis plant is estimated to cost NPR 27,11,528.794, with an annual operational expense of NPR 1,39,510. These findings highlight the necessity of proactive environmental management and offer suggestions for sustainable waste management in urban and educational settings.

Authors

Institutions

Publication Details

Journal
International Journal of Sustainable Engineering
Published
2024-10-17
DOI
https://doi.org/10.1080/19397038.2024.2416218
Citations
8
Primary Topic
Recycling and Waste Management Techniques
Type
article
Field-Weighted Citation Impact
2.35
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Study of solid waste generation and techno-economic analysis of pyrolysis of HDPE waste plastics in an academic institution in Nepal

Vikram Alexander, Biplov Paneru, Bishwash Paneru, Silvia Nova
8 citations
International Journal of Sustainable Engineering
Recycling and Waste Management Techniques
2.35
article

Study of solid waste generation and techno-economic analysis of pyrolysis of HDPE waste plastics in an academic institution in Nepal

Vikram Alexander, Biplov Paneru, Bishwash Paneru, Silvia Nova
article en
8 citations

Abstract

The Institute of Engineering (IOE), Pulchowk Campus in Lalitpur, Nepal, faces serious solid waste mismanagement issues that threaten the environment and public health. In a comprehensive investigation from June 5 to 12 June 2022, IOE students sorted waste from 58 campus locations. They discovered that the average weights of plastic, paper, and organic waste were 5.84 kg, 8.85 kg, and 3.76 kg, respectively. The study identified current waste management risks and provided recycling strategies, emphasising the 3Rs (Reduce, Reuse, Recycle). Aspen Plus simulation indicated that 0.72 kg/day of segregated HDPE waste produced 0.65 kg/day of liquid fuel. The construction of a pyrolysis plant is estimated to cost NPR 27,11,528.794, with an annual operational expense of NPR 1,39,510. These findings highlight the necessity of proactive environmental management and offer suggestions for sustainable waste management in urban and educational settings.

International Journal of Sustainable EngineeringVol. 17(1)
Pokhara University (NP), Tribhuvan University (NP), Universitas Sumatera Utara (ID)
Industry, innovation and infrastructure
Openalex Percentile: Top 12%
Recycling and Waste Management Techniques
2.35
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.