The production-inventory model with imperfect, rework, and scrap items under stochastic demand

Inventory is crucial in maintaining a smooth production process and meeting consumer demand for manufacturing companies. This research focuses on production problems involving defects, rework, and scrap items in stochastic demand. This research aims to develop a production-availability model by minimizing the expectation of total cost (ETC). The model includes four main decision variables, namely production quantity (Q), safety factor (k), production rate (P), and rework rate (P1). This research uses the Aquila optimizer algorithm to optimize the objective function. It compares with the heuristic procedure and Harris Hawk optimization algorithm. The results showed that the Aquila optimizer algorithm successfully optimized the production-availability problem. A comparison between algorithms indicates that the Aquila optimizer algorithm performs equivalently to the Harris Hawk optimization algorithm and outperforms the heuristic procedure. Sensitivity analysis shows that increasing demand uncertainty increases ETC and k. At the same time, it can decrease Q.

Authors

Institutions

Publication Details

Journal
International Journal of Advances in Applied Sciences
Published
2024-10-17
DOI
https://doi.org/10.11591/ijaas.v13.i4.pp896-906
Citations
2
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
1.11
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The production-inventory model with imperfect, rework, and scrap items under stochastic demand

Dana Marsetiya Utama
2 citations
International Journal of Advances in Applied Sciences
Management and Optimization Techniques
1.11
article

The production-inventory model with imperfect, rework, and scrap items under stochastic demand

Dana Marsetiya Utama
article en
2 citations

Abstract

Inventory is crucial in maintaining a smooth production process and meeting consumer demand for manufacturing companies. This research focuses on production problems involving defects, rework, and scrap items in stochastic demand. This research aims to develop a production-availability model by minimizing the expectation of total cost (ETC). The model includes four main decision variables, namely production quantity (Q), safety factor (k), production rate (P), and rework rate (P1). This research uses the Aquila optimizer algorithm to optimize the objective function. It compares with the heuristic procedure and Harris Hawk optimization algorithm. The results showed that the Aquila optimizer algorithm successfully optimized the production-availability problem. A comparison between algorithms indicates that the Aquila optimizer algorithm performs equivalently to the Harris Hawk optimization algorithm and outperforms the heuristic procedure. Sensitivity analysis shows that increasing demand uncertainty increases ETC and k. At the same time, it can decrease Q.

International Journal of Advances in Applied SciencesVol. 13(4)
Universitas Muhammadiyah Jember (ID)
Openalex Percentile: Top 15%
Management and Optimization Techniques
1.11
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.