PERANCANGAN STRATEGI RISIKO RANTAI PASOK DENGAN MENGGUNAKAN METODE SUPPLY CHAIN OPERATION REFERENCE (SCOR) DAN HOUSE OF RISK (HOR) (STUDI KASUS : UKM MRP.PAYAKUMBUH)

UKM Mrp.Payakumbuh is located in Payakumbuh, West Sumatra, UKM Mrp.Payakumbuh operates in the clothing industry. The problem of delays in raw materials from suppliers causes the process to take a long time. A long supply chain process can result in the company experiencing losses. There are still many rejected products, and identification of sources of risk from suppliers, raw materials, distributors and consumers is not optimal. The aim of this research is to determine chain risk priorities. supplies that must be handled and designing a supply chain risk strategy for SMEs Mrp. Payakumbuh. The results of this research obtained thirteen risks which were prioritized in this research, UKM Mrp. Payakumbuh uses the House of Risk (HOR) method to identify existing risks. In the HOR Phase 1 method, there are 20 risk events and 20 risk agents. In HOR Phase 2, this stage requires the output results in HOR Phase 1, namely designing an appropriate risk management strategy in accordance with the 8 priority risks. In HOR Phase 2 there are 13 proposed preventive actions with codes PA1 to PA13 and a priority risk management proposal is obtained, then code PA2 is obtained. Code PA2 is Controlling storage areas every month.

Authors

Institutions

Publication Details

Journal
Matrik Jurnal Manajemen dan Teknik Industri Produksi
Published
2024-09-30
DOI
https://doi.org/10.30587/matrik.v25i1.8449
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PERANCANGAN STRATEGI RISIKO RANTAI PASOK DENGAN MENGGUNAKAN METODE SUPPLY CHAIN OPERATION REFERENCE (SCOR) DAN HOUSE OF RISK (HOR) (STUDI KASUS : UKM MRP.PAYAKUMBUH)

Tengku Nurainun, Vera Devani, Misra Hartati, Fitriani Surayya Lubis et al.
Matrik Jurnal Manajemen dan Teknik Industri Produksi
Management and Optimization Techniques
article

PERANCANGAN STRATEGI RISIKO RANTAI PASOK DENGAN MENGGUNAKAN METODE SUPPLY CHAIN OPERATION REFERENCE (SCOR) DAN HOUSE OF RISK (HOR) (STUDI KASUS : UKM MRP.PAYAKUMBUH)

Tengku Nurainun, Vera Devani, Misra Hartati, Fitriani Surayya Lubis, Suci Amanda
article en

Abstract

UKM Mrp.Payakumbuh is located in Payakumbuh, West Sumatra, UKM Mrp.Payakumbuh operates in the clothing industry. The problem of delays in raw materials from suppliers causes the process to take a long time. A long supply chain process can result in the company experiencing losses. There are still many rejected products, and identification of sources of risk from suppliers, raw materials, distributors and consumers is not optimal. The aim of this research is to determine chain risk priorities. supplies that must be handled and designing a supply chain risk strategy for SMEs Mrp. Payakumbuh. The results of this research obtained thirteen risks which were prioritized in this research, UKM Mrp. Payakumbuh uses the House of Risk (HOR) method to identify existing risks. In the HOR Phase 1 method, there are 20 risk events and 20 risk agents. In HOR Phase 2, this stage requires the output results in HOR Phase 1, namely designing an appropriate risk management strategy in accordance with the 8 priority risks. In HOR Phase 2 there are 13 proposed preventive actions with codes PA1 to PA13 and a priority risk management proposal is obtained, then code PA2 is obtained. Code PA2 is Controlling storage areas every month.

Matrik Jurnal Manajemen dan Teknik Industri ProduksiVol. 25(1)
Universitas Islam Negeri Sultan Syarif Kasim Riau (ID)
Openalex Percentile: Top 69%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.