Photovoltaic Power Intermittency Mitigating with Battery Storage Using Improved WEEC Generic Models

The growing integration of renewable energy sources, such as photovoltaic and wind systems, into energy grids has underscored the need for reliable control mechanisms to mitigate the inherent intermittency of these sources. According to the Brazilian grid operator (ONS), there have been cascading disconnections in renewable energy distributed systems (REDs) in recent years, highlighting the need for robust control models. This article addresses this issue by presenting the validation of an active power ramp rate control (PRRC) function for a PV plant coupled with a Battery Energy Storage System (BESS) using WECC generic models. The proposed model underwent rigorous validation over an extended analysis period, demonstrating good accuracy using the Root Mean Squared Error (RMSE) and an R-squared (R2) metrics for the active power injected at the Point of Connection (POI), PV active power, and BESS State of Charge (SOC), providing valuable insights for medium and long-term analyses. The ramp rate control module was implemented within the plant power controller (PPC), leveraging second-generation Renewable Energy Systems (RES) models developed by the Western Electricity Coordination Council (WECC) as a foundational framework. We conducted simulations using the Anatem software, comparing the results with real-world data collected at 100 ms to 1000 ms intervals from a PV plant equipped with a BESS in Brazil. The proposed model underwent rigorous validation over an extended analysis period, with the presented results based on two days of measurements. The positive sequence model used to represent this control demonstrated good accuracy, as confirmed by metrics such as the Root Mean Squared Error (RMSE) and R-squared (R2). Furthermore, the article underscores the critical role of accurately accounting for the power sampling rate when calculating the ramp rate.

Authors

Institutions

Publication Details

Journal
Energies
Published
2024-10-17
DOI
https://doi.org/10.3390/en17205166
Citations
1
Primary Topic
Advanced Battery Technologies Research
Type
article
Field-Weighted Citation Impact
0.20

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Photovoltaic Power Intermittency Mitigating with Battery Storage Using Improved WEEC Generic Models

Thiago Trezza Borges, Janaína G. Oliveira, Paulo Roberto Duailibe Monteiro, João Alberto Passos Filho et al.
1 citations
Energies
Advanced Battery Technologies Research
0.20
article

Photovoltaic Power Intermittency Mitigating with Battery Storage Using Improved WEEC Generic Models

Thiago Trezza Borges, Janaína G. Oliveira, Paulo Roberto Duailibe Monteiro, João Alberto Passos Filho, André Fernando Schiochet
article en
1 citations

Abstract

The growing integration of renewable energy sources, such as photovoltaic and wind systems, into energy grids has underscored the need for reliable control mechanisms to mitigate the inherent intermittency of these sources. According to the Brazilian grid operator (ONS), there have been cascading disconnections in renewable energy distributed systems (REDs) in recent years, highlighting the need for robust control models. This article addresses this issue by presenting the validation of an active power ramp rate control (PRRC) function for a PV plant coupled with a Battery Energy Storage System (BESS) using WECC generic models. The proposed model underwent rigorous validation over an extended analysis period, demonstrating good accuracy using the Root Mean Squared Error (RMSE) and an R-squared (R2) metrics for the active power injected at the Point of Connection (POI), PV active power, and BESS State of Charge (SOC), providing valuable insights for medium and long-term analyses. The ramp rate control module was implemented within the plant power controller (PPC), leveraging second-generation Renewable Energy Systems (RES) models developed by the Western Electricity Coordination Council (WECC) as a foundational framework. We conducted simulations using the Anatem software, comparing the results with real-world data collected at 100 ms to 1000 ms intervals from a PV plant equipped with a BESS in Brazil. The proposed model underwent rigorous validation over an extended analysis period, with the presented results based on two days of measurements. The positive sequence model used to represent this control demonstrated good accuracy, as confirmed by metrics such as the Root Mean Squared Error (RMSE) and R-squared (R2). Furthermore, the article underscores the critical role of accurately accounting for the power sampling rate when calculating the ramp rate.

EnergiesVol. 17(20)
Universidade Federal de Juiz de Fora (BR), Uppsala University (SE), Universidade Federal Fluminense (BR), Petrobras (Brazil) (BR)
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior, Conselho Nacional de Desenvolvimento Científico e Tecnológico, Petrobras, Fundação de Amparo à Pesquisa do Estado de Minas Gerais, Instituto Nacional de Energia Elétrica, Division of Graduate Education
Affordable and clean energy
Openalex Percentile: Top 49%
Advanced Battery Technologies Research
0.20
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.