Scheduling Cluster Tools with Multi-Space Process Modules and a Multi-Finger-Arm Robot in Wafer Fabrication Subject to Wafer Residency Time Constraints

To increase productivity, more sophisticated cluster tools are developed. To achieve this, one of the ways is to increase the number of spaces in a process module (PM) and the number of fingers on a robot arm as well, leading to a cluster tool with multi-space PMs and a multi-finger-arm robot. This paper discusses the scheduling problem of cluster tools with four-space PMs and a four-finger-arm robot, a typical tool with multi-space PMs and a multi-finger-arm robot adopted in modern fabs. With two arms in such a tool, one is used as a clean one, while the other is used as a dirty one. In this way, wafer quality can be improved. However, scheduling such cluster tools to ensure the residency time constraints is very challenging, and there is no research report on this issue. This article conducts an in-depth analysis of the steady-state scheduling for this type of cluster tools to explore the effect of different scheduling strategies. Based on the properties, four robot task sequences are presented as scheduling strategies. With them, four linear programming models are developed to optimize the cycle time of the system and find feasible schedules. The performance of these strategies is dependent on the activity parameters. Experiments are carried out to test the effect of different parameters on the performance of different strategies. It shows that, given a group of parameters, one can apply all the strategies and choose the best result obtained by one of the strategies.

Authors

Institutions

Publication Details

Journal
Applied Sciences
Published
2024-10-17
DOI
https://doi.org/10.3390/app14209490
Citations
2
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.70
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Scheduling Cluster Tools with Multi-Space Process Modules and a Multi-Finger-Arm Robot in Wafer Fabrication Subject to Wafer Residency Time Constraints

Yan Qiao, Naiqi Wu, Siwei Zhang, Lei Gu et al.
2 citations
Applied Sciences
Manufacturing Process and Optimization
0.70
article

Scheduling Cluster Tools with Multi-Space Process Modules and a Multi-Finger-Arm Robot in Wafer Fabrication Subject to Wafer Residency Time Constraints

Yan Qiao, Naiqi Wu, Siwei Zhang, Lei Gu, Tan Li
article en
2 citations

Abstract

To increase productivity, more sophisticated cluster tools are developed. To achieve this, one of the ways is to increase the number of spaces in a process module (PM) and the number of fingers on a robot arm as well, leading to a cluster tool with multi-space PMs and a multi-finger-arm robot. This paper discusses the scheduling problem of cluster tools with four-space PMs and a four-finger-arm robot, a typical tool with multi-space PMs and a multi-finger-arm robot adopted in modern fabs. With two arms in such a tool, one is used as a clean one, while the other is used as a dirty one. In this way, wafer quality can be improved. However, scheduling such cluster tools to ensure the residency time constraints is very challenging, and there is no research report on this issue. This article conducts an in-depth analysis of the steady-state scheduling for this type of cluster tools to explore the effect of different scheduling strategies. Based on the properties, four robot task sequences are presented as scheduling strategies. With them, four linear programming models are developed to optimize the cycle time of the system and find feasible schedules. The performance of these strategies is dependent on the activity parameters. Experiments are carried out to test the effect of different parameters on the performance of different strategies. It shows that, given a group of parameters, one can apply all the strategies and choose the best result obtained by one of the strategies.

Applied SciencesVol. 14(20)
Macau University of Science and Technology (MO)
Decent work and economic growth
Openalex Percentile: Top 25%
Manufacturing Process and Optimization
0.70
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Scheduling Cluster Tools with Multi-Space Process Modules and a Multi-Finger-Arm Robot in Wafer Fabrication Subject to Wafer Residency Time Constraints — Yan Qiao, Naiqi Wu, et al. · Applied Sciences (2024) | TGRS Research Map | TGRS